2013-063A
Mars Atmosphere and Volatile Evolution is Mars Scout 2. Managed by GSFC, PI is Jakosky/Colorado, with science ops at LASP. Built by LMA/Denver. Box + dish + 2 panel, derived from MRO. 2.0m dia HGA. Span 11.3m across solar panels, about 12 m across LPW antennae
Mass 2550 kg wet, 903 kg post MOI, 1640 kg prop capacity (1645 kg actually filled; 2459 kg launch). AOCS has 3 thrusters
Launch 2013 Nov-Dec with B-plane miss of 83000 km (Jesick et al 2016) MOI 2014
Into 145 x 6230 x 75 deg, 4.5hr orbit. Will 'deep dip' to 125 km altitude for 5-day campaigns; primary mission is 1 year in orbit.
| MAVEN | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2013 Nov 18 | 1828:00 | Launch by Atlas V 401 | CC SLC41 |
| Azimuth 94.0 deg | |||
| T+4:02 Atlas BECO | |||
| 1832 | T+4:08 Atlas sep | ||
| 1832 | T+4:18 Centaur MES1 9:30 | ||
| 1832 | T+4:26 PLF sep | ||
| 1841 | T+13:48 MECO1 241 km | 167 x 315 x 26.66 | |
| 1901 | 157 x 324 x 26.68 | ||
| 1906:33 | T+38:33 160 km, RA 167.715 AOP 216.64 | 157 x 320 x 26.658 | |
| 1909 | T+41:24 MES2 5:29 163 km | ||
| 1914 | T+46:53 MECO2 | ||
| 1920 | T+52:42 Centaur sep | 192 x -78300 x 28.6 | |
| 195 x -78202 x 27.71 (Nov 17 plan) | |||
| 2013 Nov 19 | 0347 | Pass EL1:4 | |
| 2013 Nov 23 | 0924? | Pass L1 radius, in solar orbit | |
| 485.90d 0.9667AU x 1.452AU x 2.02 | |||
| Type II trajectory | |||
| 2013 Dec 3 | TCM1 4.8m/s | ||
| 2014 Feb 26 | TCM2 19s 0.69m/s | ||
| 2014 Sep 18 | 1147 | Enter Mars gravisphere | |
| 2014 Sep 22 | 0130 | 537 x -15778 x 74.2 | |
| 2014 Sep 22 | 0138:25 | MOI 0:34:22 1.233km/s, over N pole | |
| 0212:47 | MOI CO | 372 x 44351 x 74.2 | |
| 2014 Sep 24 | 0632 | Period Lowering Mvr-1 at apo, reduce peri 110s 8.0m/s | 194 x 44506 x 74.2 |
| 2014 Sep 26 | 1015? | Orbit adjust? | 194 x 44290 x 74.2 |
| 2014 Sep 27 | 2100 | 193 x 44239 x 74.2 | |
| 2130 | 196 x 43519 x 74.2 | ||
| 2130? | Period Reduction Mvr-1 at peri, 455 m/s | ||
| 2200 | 191 x 7954 x 74.2 | ||
| 2220 | 185 x 7944 x 74.2 | ||
| 2014 Sep 28 | 0000 | 186 x 7965 x 74.2 | |
| 2014 Oct 2 | 2100 | 185 x 7944 x 74.2 | |
| 2120? | PRM-2 | ||
| 2200 | 182 x 6400 x 74.2 | ||
| 2014 Oct 5 | 2110 | PLM-2 | 184 x 6421 x 74.2 |
| 2115? | PLM-2 CO | 168 x 6421 x 74.2 | |
| Deploy booms | |||
| 2014 Oct | Science phase | 150 x 6200 x 75 | |
| 2014 Oct 9 | 1025 | 169 x 6357 x 74.2 | |
| 2014 Oct 9 | 1030? | PRM-3, OTM for C/2013A1 flyby prep | 174 x 6423 x 74.2 |
| Deploy Langmuir probe/Waves antennas | |||
| 2200 | 168 x 6420 x 74.2 | ||
| 2014 Oct 10? | NGIMS breakoff cap ejected | 166 x 6416 x 74.2 | |
| 2014 Oct 19 | C/2013A1 Siding Spring flyby of Mars at 132000 km | ||
| 2014 Oct 23 | 2310 | 171 x 6413 x 74.2 | |
| 2315 | PLM-3 | 154 x 6413 x 74.2 | |
| 2014 Nov 19 | 0130 | 157 x 6399 x 74.3 | |
| 0140 | PLM-4 | 140 x 6398 x 74.3 | |
| 2014 Dec 3 | 2250? | 140 x 6386 x 74.3 | |
| 2014 Dec 6 | 0630 | 139 x 6390 x 74.2 | |
| 0650? | PLM-5? | 129 x 6390 x 74.2 | |
| 2015 Jan 15 | 0920 | 131 x 6375 x 74.2 | |
| 1000 | 138 x 6381 x 74.3 | ||
| 2015 Jan 18 | 0000 | 134 x 6376 x 74.3 | |
| 2015 Jan 29 | 1100 | 130 x 6376 x 74.3 | |
| 1300 | Raise period | 147 x 6368 x 74.2 | |
| 2015 Feb 10
| 2110 | 138 x 6374 x 74.2 | |
| 2015 Feb 11 | 0130 | Deep dip 1, antisolar, 155 to 134 km, 3.3m/s | |
| 118 x 6374 x 74.2 | |||
| 2015 Feb 18 | End DD1 | ||
| 2015 Feb 19 | 142 x 6129 x 74.2 | ||
| 2015 Apr 18 | Deep Dip 2 | ||
| 2015 Apr 23 | End DD2 | ||
| 2015 Jul 2 | 0440 | 143 x 6111 x 74.2 | |
| 0450 | Orbit trim | 127 x 6111 x 74.2 | |
| 2015 Jul 8 | 0250? | Deep Dip 3 | |
| 2015 Jul 15 | 0150? | End DD3, 3.9m/s | |
| 2015 Sep 2 | 0150? | Deep Dip 4 | |
| 2015 Sep 3 | 99 x 6466 x 74.2 | ||
| 2015 Sep 9 | Walk-out 1 3.3m/s | ||
| 2015 Sep 10 | Walk-out 2 0.6m/s | ||
| 2015 Nov | Begin extended mission | ||
| 2016 Mar 1 | 0000 | 136 x 6227 x 74.2 | |
| 2016 Jun 7 | Begin deep dip 5, terminator 35N | ||
| 2016 Jun 8 | Burn 2 and 3, dV 4.6m/s total | ||
| 2016 Jun 30? | End DD5 | ||
| 2016 Jul 26 | Deep Dip 6 DV1 | ||
| 2016 Jul 27 | Deep Dip 6 DV2, 4 m/s | ||
| 2016 Aug 4 | Complete DD6 | ||
| 2017 Feb 28 | 0.4m/s burn, avoid Mar 6 Phobos impact | ||
| 2017 Aug 14 | Deep Dip 7 | ||
| 2018? | Raise period for relay phase | ||
Payload:
- Particles and fields package (UCB-SSL)
- SWEA Solar Wind Electron Analyser (solar wind particles, Mars ionospheric e) (UCB-SSL/CESR/), 1.7m boom
- SWIA Solar Wind Ion Analyser (UCB-SSL/)
- STATIC Suprathermal and Thermal Ion Composition (UCB-SSL/)
- SEP Solar energetic particles (UCB-SSL/)
- LPW Langmuir probe and Waves, ionospheric properties and EUV energy input (LASP/) 7 m booms
- MAG Magnetometer (GSFC/)
- Remote Sensing Package, on 2.3m boom
- IUVS Imaging UV spectrometer, for upper atm. (CU-LASP/)
- NGIMS Neutral Gas and Ion Mass Spectrometer, composition of thermal particles (GSFC/)
No comments:
Post a Comment