1964-018A
Gemini spacecraft 1 was launched in Apr 1964 on a structural integrity test, carrying instrument pallets in the spacecraft crew couches. The mission was designated GT-1 (Gemini Titan 1). Once in orbit, it remained attached to the Titan second stage and reentered after a few days. It transmitted until 2050 UT on the day of launch.
| GT-1 | |||
| Date | Time | Event | Orbit |
| 1964 Apr 8 | 1600:01 | Launch from LC19 | |
| 1602:30 | Stage 1 sep | ||
| 1602:30 | Stage 2 TIG | ||
| 1605:40 | T+5:39 Stage 2 SECO | ||
| 1606:00 | Orbit insertion | 154 x 299 x 32.6 (RAE) | |
| 2050 | End of mission | ||
| 2144 | 89.20 160 x 309 x 32.5 | ||
| 1964 Apr 10 | 1343 | 88.78 155 x 272 x 32.6 | |
| 1964 Apr 12 | 1540 | 87.60 137 x 173 x 32.5 | |
| 1964 Apr 12 | 2100? | Reentry over S Atlantic | |
No comments:
Post a Comment