1964-003A
Relay II lifted off from pad 17B at Cape Canaveral at 2114:59 UT on 1964 Jan 21, reaching orbit at 2140:15. The orbit was 2981 x 7411 km x 46.32 deg. The satellite operated until 1965 Sep 26 when the Mojave ground station was converted for use with ATS (although a signal was reported in Sep 1980).
| Relay 2 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1964 Jan 21 | 2115:00 | Launch by Delta B | CK LC17B |
| 2117:25 | T+2:25 MECO | ||
| Thor sep | |||
| 2117:29 | T+2:29 Delta 20008 burn 2:44 | ||
| 2117:40 | T+2:40 Fairing | ||
| 2120:12 | T+5:12 Delta SECO | ||
| 19 min coast | |||
| 2139:19 | T+24:19 Delta sep | -3350? x 2090 x 46.3 | |
| -3120? x 2090 x 38.6? | |||
| 2139:26 | T+24:34 Altair 20004 burn | ||
| 2140:14 | T+25:14 Altair burnout | ||
| 2142:12 | T+27:12 Altair sep | 2089 x 7411 x 46.3 | |
| 1965 Sep 26 | End of ops | ||
No comments:
Post a Comment