1967-003A
The second IDCSP launch left the pad on 1967 Jan 18 carrying satellites 9321 to 9328 (IDCSP 8 to 15), a total payload of 467 kg. The first satellite of the batch, IDCSP 8, was deployed into a 1329.6 min orbit.
| IDCSP 8 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1967 Jan 18 | 1419 | Launch by Titan IIIC (3C-13) | CK LC41 |
| T+1:50 Core MES | |||
| T+2:03 Solids sep; 45 km? | |||
| T+3:30 Fairing 130 km | |||
| T+4:29 St 1 sep | |||
| T+4:29 St 2 MES | |||
| 1426 | T+7:43 St 2 MECO | -500? x 160 x 28.6 | |
| T+7:53 St 2 sep | |||
| T+7:56? Transtage MES | |||
| 1431 | T+12:12? Transtage MECO-1 | 171 x 182 x 28.6 | |
| 1537? | Transtage MES-2 | ||
| 1538? | Transtage MECO-2 | 193 x 33810 x 26.4 | |
| 2027? | Transtage MES-3 | ||
| 2028? | Transtage MECO-3 | ||
| 2030 | T+6:11 IDCSP 8-15 separate | ||
| 1329.6 35557 x 33800 x 0.07 | |||
No comments:
Post a Comment