Monday, December 20, 1999

STS-55 (Columbia)

 1993-027A


The second German Spacelab mission, Spacelab D-2, flew on STS-55. DLR and ESA microgravity experiments were carried. The standard 5-tank PSRD set was carried, with no EDO pallet.

The first launch attempt, on 1993 Mar 22, ended in an RSLS abort at T-3 seconds, when SSME 2011 failed. The next attempt, on 1993 Apr 26, was successful. The Shuttle slowly gained altitude because of the MOMS pointings, and an RCS trim burn was carried out on Apr 29 to cancel the gain.


STS-55 mission events 
 

DateTimeEventOrbit  

1993 Feb 7   Rollout  LC39A 
1993 Mar 22  1450:53  SSME start 
 1450:57  RSLS abort, T-3  
1993 Apr 26  1449:54  SSME start 
1993 Apr 26  1450:00  Launch  LC39A 
 1452:05  SRB sep 
 1458:31  MECO  88.22 69 x 303 x 28.5  
 1458:49  ET sep 
 1529:55  OMS 2 2:20, 68m/s 90.55 299 x 303 x 28.47 
 1532:14  OMS 2 CO 
 1619  PLBD open 
 1859  Spacelab activate 
1993 Apr 27  0200?  RCS lower apogee90.53 297 x 303 x 28.47 
1993 Apr 29  0716   90.52 294 x 305 x 28.47 
1993 Apr 29  1224  RCS lower perigee 2 km  90.48 291 x 305 x 28.46  
1993 May 2  0559   90.46 288 x 305 x 28.46 
1993 May 5  2229   90.43 285 x 306 x 28.46 
1993 May 6  0625  Spacelab deactivate 
 0924  PLBD close 
 1329:20  OMS DO (2:53) 88m/s  18 x 291 x 28.5  
 1332:13  OMS DO CO 
 1358:35  Entry interface 122 km 
 1430:00  Landing  RW22 EAFB 
 1430:15  Drag chute out 
 1430:17  NGTD 
 1430:41  Drag chute sep 
 1431:02  Wheels stop 
1993 May 11  1730SCA takeoff  Edwards 
 2115SCA landing  Biggs AAF, El Paso 
1993 May 12  1430SCA takeoff  Biggs AAF 
 1545SCA landing  Kelly AFB TX 
1993 May 14  1310SCA takeoff  Kelly AFB TX 
 1500SCA landing  Columbus AFB MS 
 1620SCA takeoff  Columbus AFB MS 
 1825  SCA landing  KSC SLF 
 2300Tow to OPF  OPF/3 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...