STS-110 (Atlantis)

 2002-018A


The first mission of Phase 3. S0 fills the bay. MT is underneath the S0 in the bay.

Smith, Walheim, Ross and Morin are EV1,2,3,4.

MT is attached to S0 prior to launch. Launch mass 116609 kg. Landing mass 91016 kg.

In addition, Atlantis will carry water supplies, and CETA lights (1 on Destiny and one on Unity).

On EVA-1, the SSRMS installed S0 to the Destiny LCA claw, and the first two MTS structs were installed. EVA-2 bolted the remaining two MTS attachment struts for S0 and connected cables.

On EVA-3, Smith and Walheim released the Destiny claw and set up the MT, releasing the launch restraints. They also rewired the SSRMS to allow it to get power while moving onto the truss. Airlock Spur installation was delayed until EVA-4.

EVA-4 will see Ross and Morin install handrails, a platform and floodlights on the truss. They will also install the Airlock Spur beam between Quest and S0, used as an EVA path from the AL to the truss and installed with multiple handrails. The Spur is installed on the starboard aft side of S0 and hinges out to attach to the AL. It is 4.2m long.

S0 is 13.4m long 4.6m dia and 12118 kg.

The crew transferred 66 kg O2 and 20 kg N2, and 664 kg of H2O to the ISS as well as 1021 kg of supplies and equipment. 1111 kg of logistics were taken from ISS to Atlantis. 104 kg of condensate were vented, and the station's orbit was raised by 9 km.

The MT was later moved from WS3 to WS4, the first MT move across a truss segment.


STS-110 
 

DateTimeEventOrbit  

2002 Mar 6   Tow to VAB/1 
2002 Mar 7   ET mate 
2002 Mar 12  1330  Rollout to LC39B 
2002 Apr 8  2044:19  Launch by STS from LC39B 
 2046:22  SRB sep 
 2046:32  OMS ASS  
 2047:49  OMS ASS CO 
 2052:42 MECO  
 2053:05  ET-114 sep  58 x 229 x 51.64 
 2122  ET apogee 
 2123:04  OMS-2 60s? 29m/s 
 2124:07 OMS-2 CO 
 2122   88.35 155 x 230 x 51.64 
 2150? ET reentry 
 2239:14  PLBD open 
2002 Apr 9  0019s  NC1 
 0925:36  Mass 114931 kg  155 x 227 x 51.6 
 1315NC2 cancelled 
 2120  NC3 2m/s   
2002 Apr 10  0600   88.29 154 x 224 x 51.6 
 1128:12 OMS 3 NH  
 1130:32  OMS 3 CO 
 1136  Mass 112415 kg 
 1211:48  OMS 4 
 1213:22  OMS 4 CO 
 1314s  NC4 
 1345:38  TI OMS 5 L 
 1345:51  OMS 5 CO 
 1351  Mass 110688 kg 
 1505  At 0.5km  
 1516  On -Rbar at 200m 
 1529  On V-bar at 100m 
 1601  Final approach 10m 
 1604:30  Docking 
 1619:24  Hard dock  92.29 384 x 388 x 51.64 
 1808  HO 
2002 Apr 11   EVA-1 Smith, Walheim 
 1000? SSRMS Grapple S0 
 1030  Uncradle S0 
 1325  First stage capture of S0 with LCA  92.27 383 x 388 x 51.64 
 1346  S0 attached (LCA closed) 
 1353  Begin depress in Quest module 
 1404  At 5 psi 
 1415  SSRMS ungrapple S0 
 1419  Resume 
 1419  TC open 
 1424  Pump power switch off 
 1433  Depress complete 0.1psi 
 1434  HO 
 1436  Batt power 
 1444  Egress Smith 
 1447  Egress Walheim 
  Walheim on SSRMS 
 1611  Forward stbd strut bolted 
 1656  Forward port strut bolted 
 1743 Stbd UT removed from S0 
 1752  Stbd umbil tray installed on Destiny 
 2000  Umbil tray installs, connections 
 2115  Smith recharges O2 tank 
  Unreel TUS 
 2219? Ingress 
 2220  HC 
 2224  Repress 
2002 Apr 13   EVA-2 Ross, Morin 
 1353  TC open 
 1353  In depress 92.27 383 x 388 x 51.64 
 1405  Depress  
 1407  HO 
 1409  Battery 
 1420  Egress Ross 
 1430  Egress Morin 
  Morin on SSRMS 
 1455  Releasing MTS strut 
 1606  Aft Stbd MTS strut install compelete 
 1818  Aft Port MTS strut complete 
 1930  second TUS installation 
 2120? Ingress 
 2133  TC closed 
 2135  HC 
 2139  Repress 
2002 Apr 14   Reboost?  92.29 384 x 389 x 51.64 
2002 Apr 14   EVA-3 Walheim, Smith 
 1330? Resume depress of Quest 
 1334  3.5psi 
 1344  Depress complete? 
 1346  HO 
 1348  Batt 
 1358  Walheim egress 
 1405? Smith egress 
  Rewiring SSRMS  92.28 383 x 389 x 51.6 
 1700  MT launch restraint bolts removed 
 1730  Rewired SSRMS 
  AL spur deferred 
 1947  Ingress Smith 
 2007  Ingress Walheim 
 2010  TC closed 
 2011  HC 
 2015  Repress 
2002 Apr 15  0139  Reboost?  92.32 385 x 390 x 51.64 
2002 Apr 16   EVA-4: Ross,Morin
 1355  Begin dp 
 1426? Depress  92.31 384 x 390 x 51.64 
 1428  HO 
 1429  Batt 
 1515  Spur deployed 
  Ingress 
 2100? HC 
 2106  Repress NASA 6:37 
2002 Apr 17  1604 HC to ISS  92.30 384 x 390 x 51.64 
 1831:13  Undocked 
 1917  +V flyaround 120m 
 1926  +R 
 1939  -V 
 1952  -R 
 2004  +V 
 2016  +R, sep  92.41 385 x 399 x 51.64 
2002 Apr 18  1726:19  OMS 6 attitude control test
 1726:29  OMS 6 CO 
 1804:19  OMS ADJ Orbit lower  91.62 308 x 399 x 51.64 
 1804:57  OMS ADJ CO 
2002 Apr 19  1249:49 PLBD close  91.65 308 x 401 x 51.63  
 1518:59  OMS DO 2:19 76 m/s? 
 1521:17  OMS DO CO  53 x 399 x 51.6 
 1555:25  EI 
 1626:58  MGTD KSC RW33 
 1627:09  NGTD
 1628:07  WS KSC RW33 
 2230 OPF 