2008-022A
IAI Spacecom (Space Communication) Ltd satellite, built by IAI.
Zenit-3M/DM-SLB launch from Baykonur, the first Land Launch mission. Launch Launch Zenit-3SLB built by Space International Services (Moscow), a collaboration of Energiya and Yuzhnoe; launch services and mission planning provided by SeaLaunch LLC. The Zenit-3SLB was Zenit-2SB60 No. 1 with the DM-SLB No. 1TL upper stage. It placed Amos 3 directly in geosynchronous orbit, eliminating the need for an apogee thruster. Located at 4W, replacing Amos 1. Alcatel payload.
| Amos 3 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2008 Apr 28 | 0500:00 | Launch by Zenit-3SLB | KB LC45/1 |
| 0502:28 | Stage 1 sep | ||
| 0505:23 | GO sep | ||
| Stage 2 MECO | |||
| 0508:33 | Stage 2 sep | ||
| 0508:40 | DM-SLB MES-1 dV about 1.01 km/s | -2250? x 180? | |
| 0511:09 | MECO-1 | 174 x 429 x 51.3 | |
| 0615:53 | MES-2 | ||
| 0621:25 | MECO-2 | 180 x 39064 x 48.8 | |
| 1205:49 | MES-3 | ||
| 1208:21 | MECO-3 | ||
| 1219:11 | DM sep | ||
| 2008 Apr 29 | 1488.33 34236 x 39368 x 0.7 | ||
| 2008 May 2 | Lower apogee | ||
| 2008 May 3 | 1440.80 34247 x 37509 x 0.7 | ||
| 2008 May 11 | 1433.87 35570 x 35915 x 0.1 GEO 0.4W+0.5E/d | ||
| 2008 May 12 | 1439.12 35762 x 35928 x 0.1 GEO 1.7W+0.8W/d | ||
| 2008 May 23 | 1436.11 35783 x 35790 x 0.0 GEO 2.5W | ||
No comments:
Post a Comment