PMM

 2011-008A


Leonardo Permanent Multipurpose Module, to be docked to Unity nadir by STS-133.

2 ISPR racks, 3 RSP, 2 RSR

10684 kg control mass: 9777 kg expected, of which 5304 kg of itemized payload, 4473 kg empty.

PK says 12320 kg at launch with 4387 kg empty mass.

Old plan:

Payload:

  • RSP 1007 (Bay 1S) 363 kg

  • RSR 0007 (Bay 1N) 454 kg

  • RSP 1010 (Bay 1P) 386 kg

  • RSP 1006/ CCAA HX (Bay 2S) 326 kg

  • RSP 1008 (2P) 386 kg

  • ISP (3Z) 145 kg

  • ISP (3P) 220 kg

  • ER8/ZSR (3N) 674 kg

  • RSP 0014 (3S) 454 kg

  • RSR 002/ZSR (4Z) 476 kg

  • RSR 0016 (4P) 408 kg

  • RSR/ZSR 0008 (4N) 420 kg

  • RSR 0014 (4S) 431 kg

  • AEC Rack System 161 kg

  • Planar HUT 2032 (EMU part)

New plan:

Payload:

  • 1Z empty

  • 1S RSP - Particulate filter, NCPS, VO2 MAX, Treadmill

  • 1N ZSR and RSR

  • 1P RSP - Inlet ORU (cabin fan), RFTA

  • 2Z empty

  • 2S RSP - FPMU, RFTA, CCAA HX (Common Cabin Air Assembly Heat Exchanger, 57 kg)

  • 2N RSR

  • 2P RSP - Robonaut stand, SARJ DLA, EMU HUT.

  • 3Z ISPR (HRS V-guides?)

  • 3S RSP - TOCA, RFTA, IAPS, PPA (Pump Package Assembly, 86 kg, spare for internal TCS loops).

  • 3N ER8/ZSR Express Rack 8 674 kg Includes MERLIN 2 experiment, relocated to ER6 on 2011 May 11.

  • 3P ISPR Water Processor Assembly Water Storage Tank, 70 kg empty; WPA Waste Water Tank, 59 kg empty.

  • 4Z empty

  • 4P RSR

  • 4N ZSR/RSR

  • 4S RSP - RFTA, ROBONAUT-2B (R2-B) 1.0m high 0.8m wide, 136 kg

  • AEC Rack System