2011-022B
3090 kg launch (EADS PK). 3100 kg (Arianespace PK), 1425 kg dry. Also known as Insat 4G. I-3K bus. Launched with PAS 1194VS adapter, inside Sylda 45-A.
4.12 x 2.32 x 3.47m box with 37.4m span.
First GAGAN satellite to reach orbit.
| ST2 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2011 May 20 | 2038 | Launch by Ariane 5ECA VA202 | CSG ELA3 |
| T+2:14 EAP sep 68 km | |||
| T+3:02 Fairing sep 107 km | |||
| T+8:47 EPC burnout, 187 km | |||
| T+8:53 EPC sep | -997 x 188 x 6.8 | ||
| 2047 | T+8:57 ESC-A burn | ||
| 2102 | T+24:42 ESC-A MECO 654 km, 9.85 km/s | ||
| 2105 | T+27:01 ST-2 sep | ||
| 2106 | T+28:53 Sylda | ||
| 2109 | T+31:10 GSAT 8 sep | 632.54 240 x 35746 x 2.5 | |
| 2011 May 21 | 2228 | LAM-1 440N 95 min burn | 15786 x 35768 x 0.5 |
| 20011 May 23 | 803.95 8725 x 35798 x 0.9 | ||
| 2011 May 23 | 0652 | LAM-2 36min | 32385 x 35768 x 0.06 |
| 2011 May 24 | s | LAM-3 | |
| 2011 May 26 | 1429.24 35538 x 35766 x 0.1 49.2E+1.7E/d | ||
| 2011 Jun 4 | On station 55E | ||
| 2011 Jun 21 | 1436.08 35781 x 35790 x 0.1 GEO 55.0E | ||
Payload:
- 24 Ku band
- GAGAN (GPS Aided Geo Augmented Nav) L1/L5 signal, SBAS PRN 127
No comments:
Post a Comment