Dragon CRS-3

 2014-022A


HDEV will be installed on the COL EPF's SDN point, NOFBX on the SDX point. OPALS will go to ELC1 Site 8.

The Falcon 9 second stage carried 4 P-PODs. Cargo up about 2090 kg?

Mass post undocking 8690 kg including 1616 kg of cargo. Implies docking mass around 9200 kg.


CRS3 
 

DateTimeEventOrbit  

2014 Apr 18  1925:22 Launch by Falcon 9 V1.1  CC SLC40 
  T+2:41 MECO 80 km 
  T+2:44 St 1 sep 
  T+2:45 St 2 burn 
  T+3:25 Dragon nose cone sep 
 1935 T+9:40 SECO 
 1935 T+10:15 Dragon sep  90.98 313 x 332 x 51.6  
 1938 T+11 Solar array covers off 
 1941 T+16:00 Kicksat ejected from stage 2 
 1941  Sporesat,AllStar,TSAT ejected 
 2010? Deorbit St 2 
 2024? St 2 entry over IOR 
  T+1:50 Coelliptic 
  T+16:00:00 Sprites ejected 
2014 Apr 20  0300   90.86 306 x 326 x 51.6 
 0400  92.80 402 x 421 x 51.6 
 1114  Grapple by SSRMS 
 1402  Berthed Harmony nadir 
 1406  Berthing complete 
2014 Apr 30   SPDM unberth HDEV 
  SPDM berth HDEV on COL 
2014 May 5   SPDM unberth OPALS 
2014 May 6   MT from WS6 to WS7 
2014 May 7?   SPDM berth OPALS on ELC 
2014 May 12    82.89 414 x 418 x 51.7 
2014 May 15   SSRMS grapple Dragon 
2014 May 17   HC 
2014 May 18  1200? Unberth 
 1326  SSRMS release Dragon 
 1330? Sep-1 
 1332? Sep-2 
 1339? Sep-3 
 1424  Apogee reduction burn 
 1715? GNC door closed 
 1812  Deorbit burn 
 1822?  Deorbit cutoff 
 1824? Trunk sep 
 1845? Entry 
 1905s  Splashdown W of Baja