Wednesday, February 24, 2016

STS-133 (Discovery)

 2011-008A


ULF-5 mission. PMM will go to Unity nadir. ELC4 will go to stbd truss. The LWAPA will be retrieved from COF and go to the SPA. On EVA-1, Kopra and Drew will stow the failed PM on ESP2. perform minor tasks (tool stanchion, APFR relocs, CP3 camera wedge install) and the JAXA 'message in a bottle'.

The MT is then translated from WS2 to WS3; the SSRMS goes from MBS to Harmony. PMM is installed. EVA-2 will vent the old PM, retrieve LWAPA, reconfig CETA, do minor tasks, Install SPDM camera 1 (CLPA 1), remove MLI from ELC4, install lights, covers etc.

EMU 3008 (Kopra, later Bowen?) and 3017 (Drew) up and down.

Launch mass 121844 kg, landing 92866 kg (PK). Launch mass 120370 kg based on early planning data. MECO mass not known - assume 3500 kg less than launch mass? Plan for 66s OMS ASS for 1171 kg prop OMS and 304 kg RCS prop. ( for actual longer duration, further 1922 kg estimated?) OMS 2 assumed 1116 kg for 29.6m/s

SSUM: Cargo up 14270 kg, 517 cons, MD 921 up 1179 down MR: up 16396 PLB., 367 down;MD 1179 up 921 down

Cargo mass total 19126 kg so launch mass minus cargo 102718. Assume 116700 kg MECO mass, minus cargo 97574. Cargo retrieved: LWAPA 100 kg? assumed Cargo deployed: 16179 Return cargo mass: 3047 assuming 100 kg LWAPA So landing mass minus cargo 89819

10324 kg OMS load. 867 kg FRCS load, 2252 kg aft RCS.

 

 


STS-133 
 

DateTimeEventOrbit  

2010 May   In OPF/3 
2011 Feb 24  2153:24  Launch  KSC LC39A 
 2155:31 T+2:03 SRB sep 
 2155:41  T+2:13 OMS assist 2:32 
 2158:13  OMS assist CO 
 2201:48  T+8:33 MECO 
 2202:09 ET sep 
 2202:08  ET Sep +X 7s RCS 
 2202:17  ET Photo +X 10s RCS 
 2231:54  T+38:30 OMS-2 29.4m/s 1:03  58 x 219 
 2232:57  OMS CO  158 x 227  
 2328:12  PLBD right open 
 2329:30  PLB left open 
2011 Feb 25  0128:55  NC1 burn OMS3 Dual 28.8s 13.4m/s 1009kg  202 x 230 
 0129:24  OMS-3 CO 
 1443:53  OMS-4 R NC2 3m/s Mass 114567 kg 91 kg 
 1444:06  OMS-4 CO 
 1538  OBSS unberthed 
 2235  OBSS berthed 
2011 Feb 26 
 0052:14RCS NPC 47 kg 
 0106:18  RCS NC3 burn 43 kg 24s 2m/s 
 1415:59  OMS-5 both, NH burn, apogee raise 114305 kg 1237 kg 
 1417:22  OMS-5 CO 83.4s 39.4m/s 
 1501:23  OMS-6 NC4 perigee raise 26m/s 1327 kg  
 1502:30  OMS-6 CO 
 1535:42 RCS NCC 22 kg 
 1633:24  OMS-7 L TI burn 11s 3m/s 98 kg 
 1633:35  TI CO 
 1653:24  MC1 
 1708:31  OOP Null 
 1727:09  MC2 at 6 km 
 1744:09  MC3 
 1754:09  MC4 62 kg (MC1-4) 
 1812  On +Rbar at 200m 
  ProxOps 168 kg 
 1815:48  RPM  
 1826:55  Begin TORVA 
 1843  On +Vbar at 100m 
 1900  30m approach 

1914:22  Docked to Harmony PMA2 
 2004  Hard dock 
 2004:09  Hooks closed 
 2116  HO to ISS 
 2310 SSRMS based on Harmony, grapple ELC-4 
 2330 SSRMS unberth ELC-4 from PLB 
 2336  ELC-4 out of bay 
2011 Feb 27  0008 SRMS grapple ELC-4 
 0016 SSRMS release ELC-4 
 0058 SSRMS grapple MBS 
 0137  SSRMS ungrapple Harmony 
 0205  SSRMS grapple ELC-4 
 0209 SRMS release ELC-4 
 0302 SSRMS berth ELC-4 on S3 truss 
 0312  ELC-4 bolted to truss 
2011 Feb 28  
  EVA-1 Bowen, Drew 
 1530  5.0 psi leak check 
 1534  1.5 psi 
 1541 Depress, 0.6 psi 
 1546  HO 
 1546  BP 
 1553  Bowen egress 
 1606  Drew egress 
 1639  J612 extension cable installed at Node 1-Node 3 
 1733  Bowen holding PM-0002 
 1806?  Bowen removes PM from MBS 
 1807  Bowen moving on arm with old PM 
 1825  PM partly in ELC2 box 
 1850  PM stowage complete 
 1905  Vent tool attached 
  TV camera adjusted on truss 
  MT tracks extended at S3 
 2156  Space in a bottle sample taken 
 2203  Ingress 
 2215  HC 
 2220  Repress 
2011 Mar 1  0450? SSRMS grapple Node 2 
 1326  SSRMS grapple PMM 
 1346  Unberthed from bay 
 1450  Ready to latch 
 1455  FIrst stage capture 
 1505  Capture complete, PMM attached to Unity 
 1530  Ungrapple PMM 
2011 Mar 2 
  EVA-2 Drew, Bowen 
 1533  1 psi 
 1535? Depress 
 1541  HO  
 1542  BP 
 1600  Egress 
 1620  PM venting complete 
 1704  LWAPA removed from COF 
 1730  LWAPA installed on sidewall 
 1807  Camera installed on Dextre 
 1812  Camera sunshade adjusted on S1 
 1929  P3 CETA light installed 
 2000  Adjusting radiator grapple stowage fixtures 
 2124  Drew ingress? 
 2127  Bowen on Zarya for Strela adapter install 
 2134  Drew inside AL 
 2143  Bowen ingress 
 2144  TC closed 
 2150  HC 
 2156  Repress 
2011 Mar 3  1403:37  Reboost VRCS 
 1432:26  Reboost cutoff 1m/s 
2011 Mar 6  2111  HC to ISS 
2011 Mar 7  1200:22  Undocking 
 1223:15 Begin flyaround at 200m on +Vbar 
 1228  On -R zenith 
 1247  On -Vbar 
 1255  On Rbar nadir 
 1308  On Vbar again 
 1309:13  Sep-1 RCS 
 1337:21  Sep-2 
2011 Mar 8  1223:46  RAMBO 3 x 10s RCS 

2000:00  OMS-8 OA 8m/s  
 2000:15  OMS-8 CO 
2011 Mar 9  
 1318:29  PLBD closed (MER) 
 1353:24  PLBD closed 
 1552:04 OMS-9 DO 2:28 84.2m/s 
 1554:32  OMS DO CO  44 x 358  
 1625:43  EI 
 1657:15  MGTD KSC RW15/ 12:19:03:41 
 1657:26  NGTD 
 1658:11  WS 
 2210In OPF bay 2 
2011 Aug 11  In OPF bay 1 
2012 Mar 9   In VAB HB4 
2012 Apr 10   SCA 905 fly from EAFB to KSC 
2012 Apr 17   SCA 905/OV103 fly from KSC to Dulles 
2012 Apr 18  
OV103 tow to Udvar-Hazy 

No comments: