Friday, July 29, 2016

MSL (Curiosity)

 2011-070A


The Mars Science Laboratory, named `Curiosity' before launch, was the largest Mars probe to date with a mass of 3260 kg in solar orbit. The Curiosity mission was to explore the geology of Gale Crater, and its 5 km high central mountain, with a large rover for at least 1 Martian year. The lab would study climate, geology, and radiation, test new landing technology, and search for organic material, carbon, nitrogen and oxygen, and sedimentary clays that could give clues to Martian habitability.

The MSL carries RTGs for power so that it can operate in shaded areas and at night.

Gale crater is in the Aeolis Quadrangle. The central mound was informally named Mount Sharp (the IAU name is Aeolis Mons); the plain containing the landing site is Aeolis Palus and the landing site itself was named 'Bradbury Landing' in Aug 2012.

"Curiosity" rover landed by skycrane descent stage. Launch by Atlas V 541 AV-028 from CC in the 2011 window.

Backshell carries two tungsten 'cruise balance mass devices' of 75 kg each and six 'entry balance mass devices' of 25 kg each.

The descent stage hovers and lowers MSL on a 7.5m 'bridle' cable to the surface. On touchdown the bridle is cut at the rover end, then DS flies away for impact.

Target site Gale crater, 4 32S 137 23E

EBMD and Cruise impacts at 136E 4.4S

Rover  850 kg  850  2.1 x 3 x 2m  
DS  829 kg  1679  3.5? x 3?m 
DS prop  390 kg  2069 
Heat shield  382 kg 2451  4.5m dia 
Backshell 349 kg  2800  
Cruise + prop  600 kg  3400  4.4m dia 


Rover  899 kg   899  2.1 x 3 x 2m  

DS  829 kg  829  1728  3.5? x 3?m 
DS prop  387 kg 1216  2115 

Heat shield  

385 kg 1601  2500  4.5m dia 
Backshell 349 kg  1950  2849 
Missing  151  2101  3000  
EBMD x 6  150 kg 2251  3150 
CBMD x 2  150 kg  2401  3300 

Cruise + prop  539 kg   3839  4.4m dia 


PHX and MPL: 12 x MR-107N 266N thruster and 64 kg prop

MR-80 2.7 kN 11 kg prop in terminal desc, RRC deorbit 74 kg deorbit MR-50F? MR-80B 3kN


Mars Atmospheric Entries - with mass breakdown in kg ------------------------

Date Spacecraft Mass (kg) Entry = Burnt-up + Prop + Deliberate + Crashed + Landed Impact (failed) intact

1971 Nov 27 Mars-2 SA 1210 0 0 565 645 0 1971 Dec 2 Mars-3 SA 1210 0 0 565 0 645 (sort of) 1974 Mar 12 Mars-6 SA 1210? 0 0 1210 645 0 1976 Jul 20 Viking Lander 1 983 0 103 290 0 590 (Mutch Station) 1976 Sep 3 Viking Lander 2 983 0 103 290 0 590 (Soffen Station) 1997 Jul 4 Mars Pathfinder 795 210 21 291 0 273 (Sagan Station) 1999 Sep 23 Mars Climate Orbiter 623 338 285 0 0 0 1999 Dec 3 Mars Polar Lander 558? 82 39 140 297 0 and Deep Space 2 2003 Dec 25 Beagle-2 68 0 0 35 34 0 2004 Jan 4 Spirit Lander 1010 183 37 363 0 427 (Columbia Station) 2004 Jan 25 Opportunity Lander 1015 188 37 363 0 427 (Challenger Station) 2008 May 25 Mars Phoenix Lander 655 82 58 172 0 343 2012 Aug 6 Curiosity 3759 459 387 2014 ----- 899 ------

Note: Airbag mass counted as deliberate impact even though attached to intact lander.

Mars Artificial Orbiting Objects --------------------------------

Date Spacecraft Dry Mass (kg) Last Known Mars Orbit (km x km x deg, date ) 1971 Nov 14 Mariner 9 555 1645 x 16838 x 64.4 (1972) 1971 Nov 27 Mars-2 2350? 1380 x 25000 x 48.9 (1971) 1971 Dec 2 Mars-3 2350? 1500 x205000 x 62.0 (1971) 1974 Feb 12 Mars-5 2350? 1760 x 32560 x 35.3 (1974) 1976 Jun 19 Viking Orbiter 1 883 411 x 56275 x 37.9 (1980) 1976 Jul 21? VO-1 Bioshield Base 74 1504 x 32574 x 37.8 (1976) 1976 Aug 7 Viking Orbiter 2 883 302 x 33080 x 80.3 (1978) 1978 Mar 3 VO-2 Bioshield Base 74 302 x 33080 x 80.3 (1978) 1989 Jan 29 Fobos-2 2300? 6145 x 6409 x 1.3 (1989) 1989 Feb 18 Fobos-2 ADU 570? 6145 x 6409 x 1.3 (1989) 1997 Sep 12 Mars Global Surveyor 674 356 x 419 x 93.0 (2006) 2001 Oct 24 Mars Odyssey 376 341 x 433 x 93.0 (2012) 2003 Dec 25 Mars Express 632 305 x 10536 x 86.9 (2012) 2006 Mar 10 Mars Recon. Orbiter 984 218 x 292 x 92.6 (2012)

Tungsten ballast masses impact location 137.64E, -4.62


MSL 
 

DateTimeEventOrbit  

2011 Nov 26  1502:00 Launch by Atlas V 541  CC SLC41 
  T+1:52 SRM jettison 
  T+3:24 PLF sep 
  T+3:31 CFLR sep 
  T+4:21 BECO 
  T+4:27 Atlas sep 
  T+4:37 Centaur MES1 
 1513 T+11:29 MECO1  165 x 324  
 1533 T+31:04 MES2 
 1541 T+39:05 MECO2 
 1544 T+42:47 Centaur sep  104 x Inf x 35.5, C3=10.78, RLA/DLA= 126.6, -1.10 
  T+47:48 TIP  194 x -87302 x 34.90 
  T+1:07:38 Centaur avoidance complete, Mars miss by 61000 km? 
  L+15d TCM-1 0.98 x 1.54 AU x 1.7  
2011 Nov 27  0030  MSL pass EL1:4 
2011 Nov 27  0033  Centaur pass EL1:4 
2011 Dec 1  1216  MSL leave Earth sphere 1.5Mkm 
2011 Dec 1  1314  Centaur leave Earth sphere 1.5Mkm 
2012 Jan 11  2300 TCM, 3 hour pulsed, Mars miss from 40000 km to 0, 5m/s  
2012 Mar 26   TCM-2 9 min 0.9 m/s 
2012 Jun 26  TCM 40s 
2012 Jul 29  0500 ERT? TCM 6s 0.01m/s 
2012 Aug   Mars arrival  0.98 x 1.54 AU x 1.66 deg 
2012 Aug 2  1800  Mars L1 1.082Mkm 
2012 Aug 4  0920  Mars SOI 0.577 Mkm 
2012 Aug 6 
 0500:47 S+0 E-10 min Cruise stage sep 
  E-9min RCS enable, despin 
 0505:17 S+4:11 E-5:49 Backshell jettison CBMD 1 and 2 
 0510:46  E+0 EI 135 km Vi = 6.10km/s theta = -15.5 deg  -54 x -13357  
   -64 x 13497 x 22.7 (Horizons) 
 0512  Cruise stage entry  
  Hypersonic maneuvers 
  E+0:51 Range control, 63 km, vrel = 5.90 km/s 
  E+1:25 Peak heating 27 km, vrel=4.69km/s 
  E+2:30 Peak load, 19 km, vrel = 3.60 km/s 
 0514:17? E+3:50 EMBD 1-6 jettison, remove CG offset 
 0515:05 E+4:10 / Actual E+4:19 10 km Parachute deploy, vrel = 0.54km/s 
 0515:25 E+4:28/ Ac E+4:39 7 km Heatshield sep 
  Radar on 
 0516:51  HS impact 
 0517:00 E+5:45 1.8 km Backshell sep, vrel 0.12 km/s 
  E+5:46 Powered descent 
  E+6:25 Throttle down 1m/s 
  E+6:28 20m, Rover/DS sep 
 0517:39 E+6:31 Mobility Deploy  
  E+6:33 Bogie release 
 0517:57  E+6:39 Rover landing 0.8 m/s  
  L+0:02 DS hovering tethered 
  L+0:03 DS tether sep from Rover 
  L+0:03 DS flyaway  
  L+0:07 DS engine cutoff  
  DS impact 

Payload:

  • MR-111C x 8 thruster, 4N, cruise TCM

  • MR-107U x 8, 300N, entry attitude

  • Descent stage:

    • 8 MR-80B descent engines, 3.1 kN each, N2H4

    • Deployer - 3 nylon cables and power/data umbilical, 7.5m

    • MEDLI Mars Entry, Descent and Landing Instrument - heat shield sensors

  • CheMin Chemistry and Mineralogy Instrument (ARC/Blake)

  • ChemCam Laser analyser, (LANL/CNES/Wiens )

  • SAM Sample Analysis at Mars (GSFC/JPL/Mahaffy)

  • RAD Radiation assessment detector (SWRI/Hassler)

  • MARDI Mars Descent Imager (Malin/Malin)

  • REMS Rover Environmental Monitoring system (Centro de Astrobiologia-Madrid/Gomez-Elvira)

  • APXS Alpha particle XR spectrometer, Cr244/Cd109 (CSA/UGuelph/Gellert)

  • DAN Dynamic Albedo of Neutrons ( Tritium source) (IKI/Mitrofanov)

  • MastCam Mast Camera, two multispectral zoom cameras (Malin/Malin)

  • MAHLI Mars Hand Lens Imager (Malin/Edgett)

  • MMRTG Multi Mission RTG, PuO2 with 8 GPHS modules totalling 4.8 kg

No comments:

Post a Comment

November 20,2006

  https://en.wikipedia.org/wiki/Association_football