Tuesday, July 5, 2016

STS-121 (Discovery)

 2006-028A


The second post-Columbia return-to-flight mission was approved for launch amid public disagreements between senior NASA managers. It was known that the foam problem had not been fully solved, but engineers concluded that the crew could find safety aboard ISS if there was significant damage to Discovery.

Mission ULF.1 used OV-103 in OPF/3; with BI-126 RSRM-93 and ET-119 on MLP-1 and pad 39B. MECO mass 148670 kg (ascent profile, includes ET?). MECO/ETSEP mass 115791 kg. Post OMS 2 at 113040 kg. Rev 4 112001 kg. Pre deorbit 110507 kg. Launch mass 121092 kg. Landing mass 102394 kg. MS5 Reiter will join EX13 as the ESA Astrolab mission.

SSME 2049 2051 2045

Space Shuttle Discovery took off from Launch Complex 39B at 1837:55 UTC on Jul 4, on mission STS-121. The OMS-2 burn at 1915 UTC put Discovery in a 155 x 253 km x 51.6 deg orbit, while ET-119 fell back to Earth in its 56 x 230 km x 51.6 deg trans-atmospheric orbit and reentered over the Pacific at about 1950 UTC.

Following the loss of Columbia on mission STS-107 in Jan 2003, the Shuttle's External Tank was redesigned to reduce the amount of thermal protection foam that falls off during ascent, and methods were developed to fix any damage to the Orbiter's thermal protection system due to foam hits. The loss of OV-102 Columbia was due to damage to the RCC leading edge panels of its left wing caused by foam from External Tank ET-93. Orbiter OV-103 Discovery then flew on mission STS-114 in July 2005, but to general consternation it turned out that its tank, ET-121, lost larger pieces of foam than expected. The Shuttle stood down again and the future of the program is riding on the new mission, STS-121.

EMU 3006, 3015 and 3008 were flown up. EMU 3009, 3010 and 3013 were returned to Earth.

Orbiter OV-103 Discovery is using tank ET-119 and solid motors RSRM-93. In the payload bay, the cargo is:

Location Cargo Mass Bay 1-2 Orbiter Docking System 1800 kg? Bay 4S? APC with SPDU? 20 kg? Bay 5-6 Integrated Cargo Carrier (ICC) 1500 kg? Keel Yoke Device (KYD) TUS/RA, EATCS-PM, FGB Bay 7S? ROEU? 20 kg? Bay 7-12 Leonardo (MPLM-1) 9500 kg Bay 13 LMC, DTO 848 954 kg Sill OBSS 202 450 kg? Sill RMS 303 390 kg -------------------------------------------------------- Total cargo: 14594 kg?

The LMC (Lightweight MPESS Carrier) carries the DTO 848 thermal protection system repair kit demo; the ICC carries the TUS (Trailing Umbilical System) for the ISS Mobile Transporter repair, as well as the EATCS-PM pump module for the ISS truss, and a fixed grapple bar. The Multipurpose Logistics Module, Leonardo, carries the MELFI freezer rack, the Express Transportation Rack with the EMCS (European Modular Cultivation System) and the OGS oxygen generation system rack, as well as 3 RSR (Resupply Stowage Rack) and 5 RSP (Resupply Stowage Platform). The ROEU (Remotely Operated Electrical Umbilical) on the payload bay sidewall provides power to the MPLM.

STS-121 will dock with the Station at PMA-2. Crew of Discovery are Steven Lindsey (CDR), Mark E. Kelly (Pilot), Michael Fossum (MS1), Lisa Nowak (MS2), Stephanie Wilson (MS3) and Piers Sellers (MS4), all of NASA. ESA astronaut Thomas Reiter (MS5) is flying as part of the Expedition 13 crew and is expected to remain aboard the Station with Vinogradov and Williams.

STS-121 would inspect the TPS post-launch using the OBSS boom and then dock with ISS. EVA-1 by Sellers and Fossum will use OBSS for inspection of the orbiter underside, and then fix a cable cutter on the ISS MT. On EVA-2 they will replace the MT TUS reel assembly and cable cutter. They will also install a TCS pump on ESP-2. A possible EVA-3 will test TPS inspection and repair techniques.

MPLM will include MELFI, OGS (Oyxgen Generation System), and a new cycle ergometer. EXPRESS Rack 2 and MELFI will transfer to Destiny. ER2 has the EMCS, a half rack with a plant growth incubator.

The MISSE 3 and 4 experiments were transferred internally to ISS for later installation.

 

 


STS-121 
 

DateTimeEventOrbit  

2006 May 12   Move from OPF/3 to VAB HB3 
2006 May 19   Move to LC39B 
2006 Jul 1  1941  Launch scrub WX T-9m 
2006 Jul 2  1714  Scrub WX T-1h17m 
2006 Jul 4  1837:55  Launch from LC39B 
 1839:57 T+2:03 SRB sep 
 1840:07 T+2:13 OMS assist 
 1842:37 T+4:35 OMS assist CO 
 1846:26 T+8:30? MECO  
 1846:47 T+8:40? ET sep  56 x 218 x 51.6 
 1915:55 T+38:00s OMS-2  155 x 231 x 51.6 
 1917:00  OMS-2 CO 
 2014:42  PLBD open 
 2245?  Unberth RMS 
  Rendezvous burns 
 2330?  NC1 burn  
2006 Jul 5  1053:31  NC2 OMS-3 
 1053:55  OMS-3 CO 
 1248s  OBSS unberth  88.32 154 x 228 x 51.7 
 1513?  NPC 
 1703   88.6 158 x 257 x 51.6 
 1823s OBSS reberth 
 2145:59  NC3 OMS-4 
 2147:47  OMS-4 CO 
2006 Jul 6  0340   90.41 252 x 336 x 51.6 

1032:59  NC4 OMS-5 
 1033:44  OMS-5 CO 
 1204:46  OMS-6 L TI burn  91.36 334 x 348 x 51.6  
 1205:03  OMS-6 CO 
 1225  MC1 
 1253  6 km range 
 1259? MC2 
 1308  3 km range 
 1317  MC3 
 1321  1 km range 
 1327  MC4 
 1340  240 m, approaching on R-bar 
 1346  200 m 
 1405  Begin moving to V-bar, at 120m 
 1414  At Vbar  
 1428  50m on approach on V-bar  
 1445  10m from PMA-2/Destiny 
 1449  2.5m  
 1451:42  Docking with PMA-2/Destiny 
 1630  HO  91.37 334 x 348 x 51.6 
  RMS grapple OBSS 

 SSRMS grapple OBSS 
  RMS attach OBSS 
 1913  Reiter IELK to ISS 
2006 Jul 7 
 0942  SSRMS grapple MPLM 
 1012  SSRMS unberth MPLM 
 1150? SSRMS berth MPLM on Unity 
 1325?SSRMS ungrapple MBS 
  RMS survey of STS 
 1855  HO to MPLM   
  SSRMS grapple MBS 
  SSRMS other end ungrapple Destiny 

 Transfer FPMU and MISSE-3/4 to ISS 
2006 Jul 8  
  EVA-1 
 1230  Begin Quest depress 
 1240  7psi 
 1244  5psi, hold  
 1258  Resume depress 
 1301  2.5psi 
 1302  2 psi 
 1305  1.5 psi 
 1308  1.0psi 
 1310  0.8psi 
 1312  0.6psi 
 1315  0.4psi, go for HO 
 1316  HO 
 1317  Battery power 
 1325  Egress Sellers 
 1335  Egress Fossum 
 1342  Inspecting MT TUS 
 1400  Retrieve APFR from PMA-1 
 1415  Heading for PLB 
 1535  Sellers on OBSS, stability tests  
 1600  Tests in progress at 14m above PLB 
 1655  OBSS extended  
 2010  Payload bay cleanup 
 2015  Installing APFR on AL exterior 
 2024  TC open 
 2025  Ingress Fossum 
 2031  Ingress Sellers 
 2033  Partial reegress/reingress Sellers 
 2033  TC closed 
 2042  HC 
 2048  Repress 
 2050  5 psi 
2006 Jul 9 
  SSRMS grapple Destiny 
  SSRMS ungrapple MBS 
2006 Jul 10  
  MT moved from site 4 to site 5 
  EVA-2 
 1129  Begin CL depress 
 1138  6 psi 
 1139  5.2 psi 
 1140  5 psi, holding 
 1156  Resume 
 1159  2.4psi 
 1200  2 psi, pump power off 
 1202  1.5 psi 
 1207  0.86psi 
 1209? At 0.7psi, AL depressed 
 1211  0.5 psi 
 1213  0.43 psi, go for HO 
 1213  HO, TC open 
 1214  Battery power 
 1223  Sellers egress 
 1230?  Fossum egress 
 1231  TC closed 
 1300  Installing FGB grapple bar on pump module 
 1312  Astronauts unberth PM 
 1316  SSRMS grapple PM 
 1403  TUS umbilical installed on MT? 
 1440  RMS ungrapple PM, held by EVA 
 1445  EVA install of PM on ESP-2 
 1520  Old TUS removed by Fossum/SSRMS 
 1600  Old TUS to Sellers 
 1615 TUS RA unberth from ICC by Fossum 
  TUS is 151 kg. Size is 1.5 x 1.5 x 0.8m. 
 1630  Old TUS RA berthed on ICC 
 1647  New TUS held by Fossum, at MT/MBS 
 1720 TUS RA install on MT/MBS 
 1840? Ingress Fossum  
 1851? Ingress Sellers 
 1852  HC 
 1901  Repress, end EVA 
2006 Jul 12 
 1015  MT move to new station 
 1036  AL depress begins 
 1045  Pause at 5psi 
 1101  Resume depress 
 1104  At 2 psi 
 1113  1 psi 
 1114  0.8 psi 
  Prep to move SSRMS toward bay 
 1115  0.7 psi 
 1115  AL depress 
 1118  0.5 psi 
 1119  HO 
 1120  Battery power 
 1130?  Egress Sellers 
 1135  Sellers moves on to SSRMS 
 1140? Egress Fossum 
 1230  Fossum, Sellers working at LMC 
 1415Spatula lost 
 1721  Sample box closed 
  Relocate grapple fixture to S1 
 1810?  Ingress Fossum 
 1810?  Ingress Sellers 
 1815  TC closed 
 1825 HC 
 1831  Repress 
2006 Jul 14  1213s  SSRMS grapple MPLM 
 1308s  MLPM unberthed from Unity 
 1350  MPLM in mid transfer 
 1443  MPLM lowering into bay 
 1450?  MPLM latched in bay 
 1523s  Ungrapple MPLM 
 1538s  SSRMS grapple MBS 
 1628s  SSRMS ungrapple lab 
2006 Jul 15  0810? HC 
 1007:38  Undock 
 1026  110 m on +Vbar 
 1029  Sep-1 0.5m/s 120m on +Vbar 
 1057  Sep-2 on +?Rbar 
2006 Jul 17  0933:29  PLBD close 
 1206:55  DO 3:02 92.0m/s 
 1209:58  DO CO  30 x 340 x 51.6 
 1242:49  EI 

1314:43  RW15 KSC 
 1314:43  MGTD 12:18:36:48 
 1314:53  NGTD 
 1315:49 WS 


No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...