Friday, August 25, 2017

Formosat 5

 2017-049A


Formosat-5 prime contractor is NSPO; it will carry a remote sensing instrument from ITRC (Instrument Technology Research Center) of Taiwan.


F5 
 

DateTimeEventOrbit  

2017 Aug 24  1851  Launch by Falcon 9  V SLC4E 
  T+2:28 MECO 1.877 km/s 
  T+2:32 Stage 1 sep 
  T+2:53 Fairing 
  St 1 apogee 247 km 
 1859 T+8:45 St 1 entry burn, 3 engines, 39s 
 1900 T+9:17 Stage 2 SECO 
 1900 T+9:24 St 1 entry cutoff 
 1901 T+10:17? St1 landing burn 30s, 1 engine 
 1901 T+10:47 Stage 1 landing JRTI 31.67N 121.66W 
 1902 T+11:18 Stage 2 sep 
 2035? Stage 2 deorbit burn 
 2100? Stage 2 reentry 166W 42S?  
2017 Aug 25    99.26 717 x 730 x 98.3 

Payload:

  • RSI Remote Sensing Imager - Pan camera, 0.45m aperture telescope, 2m res 24 km swath, MS camera, 10.0m res, 4 bands

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...