2007-035A
EMU spacesuits for four STS-118 spacewalks: 3010 (Mastracchio), 3017 (D.Williams), 3008 (Anderson)...
3010 and 3017 transfer to ISS and then back.
Cargo transfer 6686 kg total dry plus 467 consumables, 1495 return; per SODB 5366 kg transfer, 5325 kg PLB not deployed, 143 kg return (including about 100 kg MISSE).
Per mission report, 367 kg MD to ISS, 1353 kg SHAB to ISS, 4965 kg S5+ESP3. ISS to MD 184 kg (including MISSE), ISS to SHAB 1311 kg, STS to ISS 467 kg consumables (of which 46 kg to Quest HPGAs).
If S5 is 1815 kg, then ESP3 is 3150 kg.
| STS-118 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2007 Jul 2 | In OPF/2 | ||
| 2007 Jul 2 | Rollover to VAB | ||
| 2007 Aug 8 | 2236:42 | Launch | KSC LC39A |
| 2238:45 | SRB sep | ||
| 2245:07 | MECO | ||
| 2245:29 | ET sep | ||
| 2313:42 | OMS-2 2:45 | ||
| 2316:27 | OMS-2 CO | ||
| 2346? | ET reentry | ||
| 2007 Aug 9 | 0011:46 | PLBD open | 229 x 317 x 51.6 |
| 0136:15 | OMS-3 NC1 | 226 x 319 x 51.6 | |
| 0137:07 | OMS 3 CO | ||
| 301 x 329 x 51.6 | |||
| 1436:18 | OMS-4 NC2 15s burn 112855 kg OMS both | ||
| 1436:33 | OMS 4 CO | ||
| 2007 Aug 10 | 0222s | NC3 | |
| 1345:44 | OMS-5 NC4 11.8fps 112368 kg | ||
| 1345:59 | OMS 5 CO | ||
| 1515? | TI burn RCS 9s | 91.36 335 x 346 x 51.6 | |
| 1650 | On R-bar at 240m | ||
| 1656 | Begin RV pitch mvr | ||
| 1705 | Complete RPM | ||
| 1710 | Begin flyaround on nadir R-bar | ||
| 1724 | At +Vbar 112m | ||
| 1731 | At 100m, approach along Vbar | ||
| 1749 | 30m range to ISS | ||
| 1757 | 10m, final approach | ||
| 1801:56 | Docked to PMA-2 | ||
| 1950 | RMS in motion to grapple S5 | ||
| 1959 | RMS grapple S5 | ||
| 2004 | HO to ISS | ||
| 2043 | S5 PRLA release | ||
| 2050 | RMS unberth S5 | ||
| 2117 | SSPTS activated for first time | ||
| 2128? | SSRMS grapple S5 | ||
| 2130? | RMS ungrapple S5 | ||
| Mass: 109954 kg | |||
| 2007 Aug 11 | EVA-1 | ||
| 1608 | At 5 psi, holding | ||
| 1611 | Resume depress | ||
| 1614 | At 2 psi? | ||
| 1624? | Depress | ||
| 1625 | At 0.5 psi | ||
| 1626 | 23mm | ||
| 1628 | HO | ||
| 1629 | Battery power | ||
| 1637 | Mastracchio egress | ||
| 1641 | Williams egress | ||
| 1705 | S5 3m from S4 | ||
| 1730 | S5 soft capture on 2 corners | ||
| 1735 | S5 soft capture complete, bolts torquing | ||
| 1753 | S5 bolts torqued | ||
| 1755 | S5 go for ungrapple | ||
| 1827 | S5 hard mated | ||
| 1847 | Grapple fixture relocation | ||
| 1940 | Fixture relocated to keel | ||
| 2045 | Cleaning up S5 work | ||
| 2055 | In airlock recharging | ||
| 2128 | Retract P6 radiator No 3 | ||
| 2134 | Retract complete | ||
| 2230? | Ingress EV2 | ||
| 2234 | Ingress EV1? | ||
| 2241 | HC | ||
| 2245 | Repress | ||
| 2007 Aug 12 | 0050 | MT moving to WS4 | |
| 0135 | MT due to move to WS7 | ||
| SSRMS grapple OBSS | |||
| SSRMS hand OBSS to SRMS | |||
| 1913 | Focussed inspection complete | ||
| 1919 | SSRMS grapple OBSS (from SRMS) | ||
| 1936 | SRMS ungrapple OBSS | ||
| 1955 | OBSS berthed | ||
| 2027 | SSRMS grapple Lab | ||
| 2007 Aug 13 | EVA-2 Mastracchio, Williams | ||
| 1526? | Depress | ||
| 1528 | TC open | ||
| 1529 | HO | ||
| 1532 | On BP | ||
| 1536 | Egress EV2 Williams | ||
| 1539 | Egress EV1 Mastrac. | ||
| 1550 | Working at CMG-3 on Z1 | ||
| 1626 | CMG-3 removed from Z1 | ||
| 1631 | CMG-3 on Z1 handrail ball stack bracket | ||
| 1735? | New CMG-3R ORU unberthed | ||
| 1822 | CMG ORU on ESP-2 | ||
| 1851 | CMG unberthed from ORU frame | ||
| 1926 | CMG-3R installed in Z1 | ||
| 2020? | CMG-3 installed in frame on ESP-2 | ||
| 2114? | CMG-3 work complete | ||
| 2150? | Ingress | ||
| 2151 | TC | ||
| 2157 | HC | ||
| 2200 | Repress | ||
| 2007 Aug 14 | |||
| 1313 | ESP-3 grappled by SRMS | ||
| 1340? | ESP-3 unberthed | ||
| 1450? | ESP-3 grappled by SSRMS from SRMS | ||
| 1618? | ESP-3 attached to P3 | ||
| 2007 Aug 15 | EVA-3 Mastracchio, Anderson | 91.35 335 x 346 x 51.6 | |
| 1434 | Depress | ||
| 1436 | HO | ||
| 1437 | BP | ||
| 1455? | Egress EV1 | ||
| 1459? | Egress EV2 | ||
| 1530 | M. relocating SASA from P6 to P1 | ||
| 1705 | Anderson moving CETA 1 from P1 | ||
| 1728 | CETA 1 locked on S1 | ||
| 1745 | Anderson moving CETA 2 from P1 | ||
| 1802 | CETA 2 locked on S1 | ||
| 1850 | Glove damage seen on Mastracchio | ||
| 1855 | Ingress Mastracchio early for glove damage | ||
| 1951 | Ingress Anderson | ||
| 1952 | TC closing | ||
| 1955 | TC closed | ||
| 2000 | HC | ||
| 2005 | Repress | ||
| 2007 Aug 18 | EVA4, Williams, Anderson | ||
| 1314 | Depress | ||
| 1316 | HO | ||
| 1317 | BP | ||
| 1325 | Egress Williams | ||
| 1335 | Egress Anderson | ||
| 1420 | Install OBSS clamps on S1 truss | ||
| 1500 | Retrieve 2 MISSE packs (MISSE-3, 4) | ||
| 1630? | EWIS antenna installed on Destiny | ||
| 1802 | Ingress Anderson | ||
| 1803 | Ingress Williams | ||
| 1805 | TC closed | ||
| 1814 | HC | ||
| 1819 | Repress (NASA: 5:02) | ||
| 2000? | Transfer 3010/3017 to STS | ||
| 2110 | ISS side HC | ||
| 2007 Aug 19 | 1156:27 | Undocking along V-bar | |
| 1226? | 120m on V-bar, sep-1 burn | ||
| 1248 | On zenith R-bar, sep-2 burn 4s 0.5m/s | ||
| 2007 Aug 21 | 1252:28 | PLBD closed | 91.38 336 x 347 x 51.6 |
| 1525:12 | OMS DO 3:35 110.0m/s | ||
| 1528:47 | OMS DO CO | -28 x 342 x 51.6 | |
| 1600:27 | EI | ||
| 1632:17 | MGTD KSC RW15 | ||
| Landing mass 100878 kg | |||
| 1632:29 | NGTD | ||
| 1633:20 | Wheels stop | ||
| 2210 | Tow to OPF/2 | ||