Friday, December 25, 1992

Gemini 12

  1966-104A


Shortly after the coelliptic burn it was discovered that the radar was not functioning. Aldrin used the sextant instead, bringing his rendezvous expertise to good use.

The Agena showed some possible PPS problems during ascent, so only SPS burns were made. The Agena also gave problems in the docked phase, with the docked spacecraft difficult to control in gyrocompass mode.

The tether experiment was repeated. This time the docking bar was fitted with a cap to retain the tether, so that the EVA clamp was not needed. The payload area in the adapter section carried an EVA work station. A reserve oxidizer tank was removed from the OAMS system to save weight.

Splashdown was at 24 35 N 69 57 W in the Atlantic.


GTA-12 
 

DateTimeEventOrbit  

1966 Nov 11  2046:33  Launch 
 2049:06 BECO T+2:33  -5925 x 118 x 29.79  
 2049:08  T+2:35 Staging 
 2052:16 T+5:43 SECO  160 x 241 x 28.90 
 2052:39  T+6:06 Stage 2 sep, 3s burn 
 2052:40  Jettison radar and horizon sensor covers 
 2052:42  Sep burn complete
 2053:16  IVAR 34s 7.6, -4.0, -0.9 m/s 
 2053:31  Lateral burn 22s 
 2053:50  IVAR off 
 2053:53  T+7:20 OAMS off  88.87 161 x 270 x 28.87 
 2059  CDR window cover jet 
 2100  PLT window cover jet 
 2136:13  T+0:49:40 NC1 Phase adjust 20m/s 1:28  89.55 228 x 270 x 28.90 
 2200:55  T+1:14:22 NPC Plane adjust 2.5m/s  89.55 228 x 270 x 28.88 
 2234:25 T+2:22:55 CSI Corr. Comb. mvr 2m/s 10s  89.68 230 x 281 x 28.88 
 2309:27  PDH coelliptic NSR 15m/s 1:06  90.11 272 x 281 x 28.88 
  Radar failure  
 2352:21  T+3:05:47 TPI 7m/s  90.41 281 x 301 x 28.87 
 2357:47  MC1 
1966 Nov 12  0003:40  MC2 
 0010:19  MC3 
 0015:35  MC4 
 0019:09  TPF  90.50 290 x 301 x 28.87 
1966 Nov 12  0020  At 1.5km 5m/s 
 0025  At 1 km 6m/s 
1966 Nov 12  0032  T+3:46 M=3 rendezvous with TDA/Agena 5001R 
 0100:02  Docked with TDA 
 0117:55  Undocked 
  Flyaround Agena 
 0136:16  incomplete docking 
 0137?  Undocking
 0153  GATV rolled 90 deg
 0153:47  Docked 
 0249:37  Undocked 
 0254:27  Docked 
 0351:39 Phasing (docked SPS) 51s 13m/s  89.92 253 x 281 x 28.88 
 0822   90.09 244 x 313 x 28.8 (TLE) 
 1202:51  Sync for eclipse (docked SPS 18s 5m/s) 90.08 253 x 297 x 28.88 
  Solar eclipse photos 
 1612:16  Depress 
 1615  HO 
 1616  SEVA, PLT  
 1617  Jettison waste bag 
  Attached handrail and UV camera 
  S012 retrieved 
 1800?  Reentered W of Africa 
 1845:03  Hatch closed 
 1845:03  Repress (02:32:47) 
   258 x 300 x 28.9 (PAO) 
 2320   90.02 258 x 291 x 28.9 (TLE) 
1966 Nov 13  1532  Begin depress 
 1534:04  Depress 
 1534:59 Hatch open 
 1538  PLT egress 
 1550  Attach tether to Agena 
  Attach S010 to GATV 
 1611  work at AM station 
 1728  Back near cabin 
 1736  Jettison handrail and 2 waist tethers 
 1741  Hatch closed (1:55) 
 1742:41  Repress (2:08:37) 
 1941  Pitch down to GG attitude 
 2009:50  Tethered undocking, radial sep 
  30m Gravity gradient test 
1966 Nov 14  0037:30  Tether released (docking bar) 
 0101:00  Sep burn 2m/s 8s  264 x 300 x 28.8 (PAO) 
   90.15 260 x 296 x 28.88 (MR) 
 0816   89.95 252 x 291 x 28.8 (TLE) 
 1034:20  Phase adj 2m/s 9s  265 x 293 x 28.8 (PAO) 
   90.08 261 x 289 x 28.89 (MR) 
 1128  S-51 Centaure HMG observed 
 1303  S-51 fail to observe HMG launch 
 1450  Begin depress 
 1451:57  EVA-3 depress 
 1453  Hatch open 
  PLT SEVA, UV photos 
 1455  Jettison ELSS 
 1455  Equipment dump 
 1500  Begin UV photos 
 1540? S-13 bracket jettison 
 1540? EVA camera cables jett 
 1546? Return to cabin 
 1548  Hatch closed 
 1549:36  Repress (00:51:39) 
1966 Nov 15  1343  Thruster test, 2 failed  90.06 261 x 287 x 28.87 

1845:36  AM sep 
 1846:31  Retrofire 91.6m/s aft 34.6m/s down  -40 x 285 x 28.85 
   -46 x 293  
 1847:23  RM sep 
 1921:04  Splashdown 
 2027  Recovery by USS Wasp 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...