Tuesday, November 8, 1994

Surveyor 6

  1967-112A


Surveyor 6 was launched at 0739 on 1967 Nov 7 by Atlas Centaur from Kennedy on azimuth 83.0 deg. The probe made a two burn parking orbit ascent. It made a course correction at 0220 on Nov 8. Surveyor VI landed on the Moon at 0101:05 on Nov 10 at 0.47N 1.48W in Sinus Medii. (0.47N 1.48W comes from LO photo correlation, 0.44N 1.37W from tracking; final project report gave 0.51N 1.39W).

At 1032 on Nov 17 the vernier engines were reignited to make a 3m high hop, the first rocket launch from the surface of the Moon. 


Surveyor 6 
 

DateTimeEventOrbit  

1967 Nov 7  0739:01  Launch by AC-14  CKAFS LC36B 
 0741:34 Atlas BECO 
 0741:37  Booster sep
 0724:19  Panels sep
 0724:48  Fairing sep
 0743:07 Atlas SECO 
 0743:09 Atlas sep 
 0743:18 Centaur MES-1 
 0748:42 T+9:38 Centaur MECO-1,  87.72 159 x 169 x 30.0 
 0801:34 Centaur MES-2 
 0803:30 Centaur MECO-2  170 x 664642 x 29.0 
 0803:47  SV legs deploy 
   169 x 686276 x 29.01 (GD) 
   167 x 684964 x 29.00 (JPL)  
   169 x 684614 x 29.00 (TMX1844) 
 0804:30  Centaur sep   
 0808:29 Centaur retro  168 x 401708 x 28.98 (TMX1844) 
1967 Nov 8  0220:02  TCM 10s 10.1m/s  371 x 644020 x 29.09  
1967 Nov 10  0057:55  AMR mark 
 0058:01  Verniers on 2.587 km/s 
 0058:03 Radar sep  -1375 x -9838 x 10.82  
 0058:03 Retro  
 0058:42 Retro burnout V=157m/s?  -1737 x 18? x 10.8 
 0058:52  Vernier high thrust 
 0058:54 Retro sep 
 0101:02  Vernier off at 4m 
 0101:04  Landing  
 1458?  Centaur flyby 27915 km 
  Centaur orbit  169069 x 399952  
1967 Nov 11  0322  RCS jet test 
 0346  RCS jet test 
1967 Nov 17  1032:05  Vernier hop, 3m alt, 2.5m range 
 1032:07  2.5s burn complete 
 1032:11  6.1s flight 
1967 Nov 26  0935  Shut down for lunar night
1967 Dec 12 1641  Reactivated 
1967 Dec 14  1914  End of tx 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...