Saturday, October 7, 1995

Kosmos 2103

 1990-096A


RCS was 17.6m2; no debris tracked.


Kosmos-2103 
 

DateTimeEventOrbit  

1990 Nov 14  0633:40 Launch by 11K69  Baikonur
 0636  Stage 1 sep 
 0638  Stage 2 sep  
 0722?  AKM burn 
1990 Nov 14    92.76 402x417x65.0 
1990 Nov 19    92.78 404x416x65.0 
1991 Jan 3   begin orbit decay 
1991 Jan 21    92.65 398x409x65.0 from 92.72 401x413 
1991 Feb 17    92.13 372x385x65.0 
1991 Apr 2.6   88.49 193x205x65.0 
1991 Apr 3.5   87.60 149x161x65.0 
1991 Apr 6 reentered 

Aviation Week: April 17,1995

 https://welib.org/md5/5e4c4b050e3ad281f02e92c3744a942d

Maclean’s: June 19,1995

 https://welib.org/md5/a11fab26b96166cd4702784bfa333c22

The Princess Aline

 https://www.gutenberg.org/files/327/327.txt

Kosmos 1599

 1984-102A



Kosmos-1599 
 

DateTimeEventOrbit  

1984 Sep 25  1430 Launch by Soyuz  PL 
 1438  Blok I sep 
1984 Sep 26    89.64 167 x 247 x 67.1 
1984 Sep 26   Orbit raise  89.57 180 x 326 x 67.1 
1984 Oct 4    89.13 173 x 289 x 67.1 
1984 Oct 5   Orbit raise  89.79 177 x 349 x 67.1 
1984 Oct 16    89.17 168 x 298 x 67.1 
  Orbit raise  89.64 177 x 336 x 67.1 
1984 Oct 27    88.91 166 x 274 x 67.1 
  Orbit raise  89.81 175 x 354 x 67.1 
1984 Oct 29    89.73 174 x 346 x 67.1 
  Orbit lower  89.01 175 x 275 x 67.1 
1984 Nov 1    88.77 170 x 256 x 67.1 
1984 Nov 1   Orbit raise  89.62 176 x 334 x 67.1 
1984 Nov 10    89.08 170 x 287 x 67.1 
1984 Nov 10   Orbit raise  89.28 176 x 300 x 67.1 
1984 Nov 12    89.14 174 x 289 x 67.1 
1984 Nov 13   Orbit raise  89.34 181 x 302 x 67.1 
1984 Nov 18    88.83 173 x 259 x 67.1 
1984 Nov 18   
88.94 15 x 268 x 67.1 
1984 Nov 20  1130   88.78 169 x 258 x 67.1 
1984 Nov 21  
 1854?  deorbit 
 1908?  entry 
 1920?  Landing 

Friday, October 6, 1995

Kosmos 27

  1964-014A


3MV-1 No. 3 was to test new systems for space probes and was to be launched toward Venus. It reached Earth orbit and the Blok-I third stage separated but the fourth stage control system failed. 3MV-1 No. 3 was given the cover name Kosmos-27; it would have been Zond-1 if successful. The USSR reported that Kosmos-27 `required only one orbit to complete its flight plan'.


Kosmos-27 
 

DateTimeEventOrbit  

1964 Mar 27  0324:42  Launch by 8K78M  KB 
 0329  Blok-A burn 
 0329  Blok-I burn 
 0333  Blok-I sep  167 x 198 x 64.8 
  Blok-L control system failed
  
1964 Mar 27  1337   88.56 197 x 208 x 64.8 (TLE) 
1964 Mar 28  0700?  Reentered 

STS-41 (Discovery)

 1990-090A


STS-41 deployed the Ulysses probe. After a last-minute hold at T-31s launch took place at 1147 UTC on 1990 Oct 6. On Oct 7 the crew executed the OMS-4 burn to phase the orbit for improved landing conditions.

DTO 827, a test of the digital autopilot's ability to operate at high pitch rates, ran into cross-coupling problems and was terminated after 40s after using up 137 kg of RCS fuel.


STS-41 
 

DateTimeEventOrbit  

1990 Aug 27   Tow to VAB 
1990 Aug 28   ET mate 
1990 Sep 5   Rollout  LC39B 
1990 Oct 6  1147:15  Launch from LC39B 
 1149:19  SRB sep 
 1155:46  MECO  65 x 291 x 28.5 (PK) 
 1156:03  ET sep  88.17 72 x 294 x 28.5 (OMS dV) 
 1227:08  OMS-2 (2:25) 68.1m/s 
 1229:32  OMS-2 CO 
 1300   90.51 295 x 302 x 28.5 
 1311  PLBD open 
 1707  Tilt table deploy 
 1748:15  ULS/IUS/PAM-S deploy 
 1749:13  RCS sep 1 
 1803  OMS-3 sep burn 23s 
 2030   90.83 300 x 329 x 28.5 
1990 Oct 7  1043:53  OMS 4 phasing, 44s 12m/s 
 1100   90.39 285 x 301 x 28.5 
 1407  RMS uncradle 
 1522  RMS parked for ISAC 
1990 Oct 9  0600   90.38 283 x 303 x 28.5 
 1502  RMS cradle 
1990 Oct 10  1020PLBD closed 
 1300:05  OMS DO (2:38) 90.4m/s  90.37 281 x 303 x 28.5 
 1302:33  OMS DO CO  -3? x 285 x 28.5 
 1326  Entry 
 1357:18  Landing RW22 EAFB 
 1357:32  NGTD 
 1358:10  Wheels stop 
1990 Oct 15  1230
SCA takeoff  EAFB 
 1715SCA landing  Sheppard AFB TX 
 1900SCA takeoff 
 2140SCA landing  Eglin AFB FL 
1990 Oct 16  1055SCA takeoff 
 1140SCA landing  KSC SLF 

1500Tow to OPF/1 

Kosmos 950

 1977-086A



Kosmos-950 
 

DateTimeEventOrbit  

1977 Sep 13  1510 Launch by Soyuz-U  Plesetsk 
 1514  Blok-I burn 
 1518  Blok-I sep 
1977 Sep 18   89.38 203 x 284 x 62.8 
1977 Sep 26    89.15 198 x 265 x 62.8 
1977 Sep 27   
 0608? Deorbit 
 0618? PO sep 
 0624? Entry 
 0639? Landed 


Sunday, October 1, 1995

Explorer 16

 1962-070


The first successful satellite in the series was S-055B, which became Explorer 16 on reaching orbit. It carried an array of different kinds of micrometeorite detectors. Launch was on 1962 Dec 16 at 1433 by a Scout X-3 from Wallops into a 750 x 1181 km x 52.0 deg orbit. The satellite successfully measured the penetration rate of small meteoroids. It operated until 1963 Jul 25. In Dec 1993 its orbit was 744 x 1159 km.


Explorer 16 
 

DateTimeEventOrbit  

1962 Dec 16  1433  Launch by Scout X-3 
  T+1:08? St 1 Algol burnout 30 km 1.22 km/s 
  T+1:25? St 2 Castor burn 
  T+2:07? St 2 burnout 91 km 2.90 km/s 
  T+2:13? Fairing sep
  T+2:13? St 3 Antares burn 
  T+2:45? St 3 burnout 160 km? 
  T+9:40? St 3 sep  -4526? x 747 x 52.04 
  T+9:41? St 4 Altair burn 
 1443  St 4 burnout  104.37 746 x 1183 x 52.04  
1963 May 29   main telemetry channel failed 
1963 Jul 25   end of ops 

Payload:

  • Micrometeorite microphone impact detectors

  • Grid detector

Tuesday, September 26, 1995

Molniya 113

  1970-013A


Molniya-1 F18 was the first C-plane satellite. It was also the first Molniya to be launched from the Plesetsk cosmodrome. 


Molniya-1 F18 
 

DateTimeEventOrbit  

1970 Feb 19  1857:15 Launch by 8K78M  PL 
  BVGD sep 
  GO sep 
  T+4:46 Blok A sep 
  T+4:56 KhO sep 
  T+8:46 Blok-I MECO 
 1906 T+8:50 Blok-I sep 
  T+53:16 BOZ burn 
 1951?  T+53:56 BOZ sep 
  ML burn 
  T+56:46 ML MECO 
 1954?  T+56:54 ML sep   
1970 Feb 24    703.17 464 x 39167 x 65.4 
1970 Mar 5    703.08 464 x 39162 x 65.4 
1970 Mar 11    702.60 462 x 39141 x 65.5 
1970 Apr 6    717.66 474 x 39873 x 65.5 
1970 Apr 8    717.70 475 x 39875 x 65.5 
1970 Jun 28    717.84 431 x 39926 x 65.6 
1970 Nov 6    717.70 430 x 39920 x 65.8 
1970 Nov 29    717.58 412 x 39932 x 65.9 
1971 Feb 17    717.50 413 x 39927 x 66.0 
1971 Jun ?   End of stabilization
1975 Aug 18    711.09 150 x 39873 x 65.4 
1975 Sep 29   Reentered 

Sunday, September 24, 1995

Kosmos 2102

 1990-092A


Kosmos-2102 was launched two weeks after the recovery of Kosmos-2089. Nine days after launch it moved to a low orbit for a series of passes over Iraq, but resumed its standard orbit a week later.


Kosmos-2102 
 

DateTimeEventOrbit  

1990 Oct 16  1900:00 Launch by Soyuz  PL 
 1908  Blok-I sep 
1990 Oct 16.9   89.64 183x330x62.84 
1990 Oct 17.4   89.75 184x338x62.84 
1990 Oct 19.3   90.04 191x361x62.8 from 89.64 183x330 via 90.38 214x371 
1990 Oct 25   mv down to observe Iraq 
1990 Oct 25.1   89.03 182x270x62.8 from 89.73 185x336 
1990 Oct 28.2    89.02 177x274x62.8 from 88.78 176x252 
1990 Nov 1   SpK-1 fiducial 
1990 Nov 2   mv up, resume standard orbit 
1990 Nov 2.1   89.74 179x343x62.8 from 88.64 169x244 
1990 Nov 11.8   89.12 170x292x62.8 from 88.82 163x269 
1990 Nov 14.8   89.70 180x338x62.8 from 88.87 164x273 
1990 Nov 20   SpK-2 fiducial 
1990 Nov 22.2   89.68 180x337x62.8 from 89.14 171x292 
1990 Nov 29   90.10 181x377x62.8 from 89.20 172x297 
1990 Dec 8.5   89.08 168x289x62.8 from 88.61 167x244 
1990 Dec 11.5    89.16 160x305x62.8 from 88.82 163x268 
1990 Dec 12.7   88.99 158x290x62.8 
1990 Dec 14 
 1902?  Deorbit 
 1917?  Entry 
 1929? Landed

OSO 4

  1967-100A


The fourth Orbiting Solar Observatory satellite carried an improved set of experiments including an early celestial x-ray astronomy experiment. Launch was at 1558 on 1967 Oct 18 by Delta from Cape Canaveral. It reached a 95.6 min, 546 x 560 km x 33.0 deg orbit at 1610. OSO IV operated until 1972 Feb; it was reactivated in 1974. The satellite reentered on 1982 Jun 15.


OSO 4 
 

DateTimeEventOrbit  

1967 Oct 18  1558:00  Launch by Delta  CC LC17B 
  T+2:29 MECO 
  St 1 sep 
  T+5:08 SES-1 2:34 
  T+7:42 SECO 
 1609 T+11:24 St 2 sep 
 1609T+11:37 FW4D burn 
 1610 T+12:08 TECO 
 1610 FW4D sep 
1967 Nov 30   HCO spectrometer off 
1967 Dec 13   XR experiment off
1971 Dec 7   Raise to retirement orbit
1972 Feb   End of ops 
1974   Reactivated
1982 Jun 15   Reentered 

Saturday, September 23, 1995

Sunset Heights V: vapor trails in the skies

 C:>usa.talk

ATDT 1(310)292-6098...Connection complete.

Welcome to the USA-Talk Bulletin Board.

Your handle is bananya.

Log in at 8:47:50 am on 12/12/86.

bananya: ok, what the hell was shaking my beach house abt half an hr ago? any1 wanna tell me?

archiesnakeson: the athena 30 launch. 2 astronauts inspecting landsat 4 ahead of next week's shuttle mission. also,hey there,anya! another convert to the USA-Talk faith,i see.

bananya: imy so much,snake! first i had to hear from spike that you and luce had broken up,then from hazel that you and tessa were together? u had so much rotten luck w/girls. melanie - dumped u for sean. michelle - broke up because she liked blt. imogen - decided she liked girls better than boys. caitlin - broke up after that spring fling. terri - broke up after she discovered craig. amy - decided she was into gavin. lucy - dumped u for bronco. (hubba,hubba!)

nancykramie: u thought u had it bad,anya? i live in the santa catarina hills and it felt like an earthquake!

bananya: hey,nancy! u still playing at being a real-life nancy drew?

nancykramie: u know it,anya!

hollyjsinclair: so that's the sky-jellyfish-thing i saw from my mansion. i was having some breakfast outside when i saw it almost right overhead.




Facecasts:

Anya - Jami Gertz 

Nancy - Lauri Hendler

Holly J - Jessica Steen

Club Management: March-April 1995

 https://welib.org/md5/684fbf481d3344b05f51a647c7964238

Thursday, September 21, 1995

Venera 2C

  1962-045A


The third probe to be launched in the 1962 Venus window was 2MV-2 No. 1, on 1962 Sep 12. As the 8K78 rocket reached orbit and shut down the third stage main engine, a failed LOX cutoff value caused an explosion in one of the four vernier chambers in the 8D715K engine. However, the mission continued as planned until the Blok-L main engine shut down 1s into its burn when the oxidizer pump failed.


2MV-2 No. 1 
 

DateTimeEventOrbit  

1962 Sep 12  0059:13 Launch by 8K78  KB 
 0104  Blok-A sep 
 0104  Blok-I burn 
 0108  Blok-I shutdown 
 0108:04 Blok-I explosion 
1962 Sep 12  0108  Blok-I sep  186 x 213 x 64.9 
 0200  T+1:00:50 BOZ burn 
 0200  T+1:01:30 Blok-L burn 
 0200  Blok-L cutoff at 1s 
1962 Sep 14   Reentered 

Monday, September 18, 1995

Heartbreak Café

https://welib.org/md5/88757fd28cc716c1551dffb2a339e223

Kosmos 583

 1973-062A


Kosmos-583 flew a 65.0 degree mission from Baikonur in Aug-Sep 1973. A TG recovery beacon was detected.


Kosmos-583 
 

DateTimeEventOrbit  

1973 Aug 30  1030:02  Launch by 11A57 KB  
 1034  Blok-I burn  
 1038  Blok-I sep  
1973 Aug 31  
 89.52 203 x 297 x 64.9 
1973 Aug 31  1430   89.35 204 x 298 x 64.92 (RAE) 
1973 Sep 8  0607   89.40 201 x 288 x 64.9 
1973 Sep 12  0528   89.34 198 x 284 x 64.9 
1973 Sep 12  0653? Retrofire 
 0703?  PO sep 
 0709? Entry  -171 x 221 x 64.90 
 0724? Landed 

Soyuz TM-4 (Ocean)

 1987-104A


11F732 No. 54 was launched as Soyuz TM-4 in Dec 1987, carrying Vladimir Titov, Musa Manarov, and Anatoliy Levchenko.


    Crew

  • Komandir Vladimir Titov, VVS

  • Bortinzhener Musa Manarov, NPO Energiya

  • Kosmonavt-issledovatel' Anatoliy Levchenko, Min. Av.


Soyuz TM-4, Flight 1 
 

DateTimeEventOrbit  

1987 Dec 21  1118  Launch by Soyuz-U2  KB 
 1120 Blok-BVGD sep 
 1122  Blok-A sep  
 1126  Blok-I cutoff 
 1126  Blok-I sep 
 1200   88.61 168 x 239 x 51.6 
   90.02 255 x 295 x 51.6 
1987 Dec 23    91.54 329 x 354 x 51.6 
 1227  Rendezvous with Mir 
 1251  Docked at +X 
 1420  Hatch open 


    Crew

  • Komandir Vladimir Titov, VVS

  • Bortinzhener Musa Manarov, NPO Energiya


Soyuz TM-4, Flight 2 
 

DateTimeEventOrbit  

1987 Dec 30  0745Hatch closed, crew Titov, Manarov 
 0910  Undocked +X 
 0929  Docked -X 


    Crew

  • Komandir Anatoli Solov'yov, VVS

  • Bortinzhener Viktor Savinykh, NPO Energiya

  • Kosmonavt-issledovatel' Alexander Alexandrov, Bulgaria


Soyuz TM-4, Flight 3 
 

DateTimeEventOrbit  

1988 Jun 17  0415Hatch closed; crew Solov'yov, Savinykh, Alexandrov 
 0618  Undocked Mir -X 
 0830? BO sep 
 0922  Retrofire
 0926  DO CO 
 0948?  PAO sep 
 0952?  Entry 
 1012:32  Landed

Progress 22

 1984-051A


Progress 7K-TG No. 122 (Progress-22) was launched on 1984 May 28. It carried the second Kant SAR submarine location antenna.


Progress-22 
 

DateTimeEventOrbit  

1984 May 28  1412:55Launch by Soyuz-U  KB 
 1430   88.79 187 x 242 x 51.62 
   88.82 188 x 244 x 51.63 
1984 May 29  1200   89.49 203 x 297 x 51.6 
 2200   90.73 290 x 330 x 51.6 
1984 May 30  0700   90.72 290 x 330 x 51.6 
 1547  Docked with Salyut-7 
1984 Jun 4  0700   91.44 334 x 357 x 51.6 
1984 Jun 26  0700   91.35 328 x 354 x 51.6 
1984 Jul 15  1336  Undocked 
1984 Jul 16  1852:00 Deorbited 

Red Lightning, Black Thunder

https://welib.org/md5/2a8c4deb2aa7cdd141253fad999f3165

November 20,2006

  https://en.wikipedia.org/wiki/Association_football