Wednesday, July 28, 1999

STS-37 (Atlantis)

 1991-027A


The highlight of STS-37 was deployment of the Compton Gamma Ray Observatory.

EVA-1 was a contigency EVA to release the GRO high gain antenna. EVA-2 was the planned EVA, the EVA Flight Development Experiment to test out CETA, the MFR, and CLIP. The EVA began at 1443. The hatch was closed at 2041, and the airlock was repressurized at 2054. Total depress time was 10h23m; official time was 9h17m (=3:30+5:47)

The DTO OMS burn on Apr 9 demonstrated the use of star trackers in rendezvous maneuvers, and other rendezvous procedures.


STS-37 
 

DateTimeEventOrbit  

1991 Mar 8   Tow to VAB 
1991 Mar 15   Rollout  LC39B 
1991 Apr 5  1422:45  Launch from LC39B 
 1424:50  SRB sep 47.7 km  -6256 x 63?  
 1431:18  MECO  59 x 437 x 28.5 
 1431:36  ET sep  89.68 71 x 445 x 28.5 (OMS dV) 
 1504:28  OMS-2 (3:55) 112 m/s 
 1508:23  OMS-2 CO 
 1530?   93.63 446 x 458 x 28.5 
 1950  RMS checkout 
1991 Apr 6  1225  Cabin depress to 10.3 psi 
1991 Apr 7  
 93.63 445 x 458 x 28.5 
 1100  Go for grapple 
 1105?  RMS grapple GRO 
 1114confirmation of grapple
 1157?  GRO unberth 
 1206  RMS raising GRO out of bay 
 1222  RMS/GRO in release position 
 1249  Right solar array deploy complete 
 1322  Solar arrays deploy complete 
 1403  Command to deploy HGA 
 1409  HGA failed to deploy 
 1557  Go for EVA preparation 
 1822  Begin airlock depress 
 1827  5 psi leak check 
 1831  Resume depress 
 1839? at vacuum 
 1839  EVA-1 (04:38) depress  
 1842Hatch open  
 1845Egress  
 1855  Apt frees boom  
 1920  Completing EVA work reconfiguring GRO 
 1940? EFDE get-aheads 
 1950? PDAP 1 from airlock  
 2000  PDAP 1 active on CETA outrigger handrail 
 2003EVA Translation experiment (ETE)  
 2010  Evaluate ETE outrigger handrail 
 2025? Ross working at CLIP, with PDAP 
 2110? Ross on CLIP holding Apt, mass handling test 
 2120  Connect ETE rope tether across PLB, translation tests 
 2125 Rope from CLIP to CETA 
 2140  Complete rope tether work 
 2150PLB cleanup 
 2200?  Back to airlock  
 2236:47  GRO deployed 
 2236:48  RCS sep 
 2244  Go to repress airlock  
 2247  RCS sep 
 2300  Hatch closed and locked  
 2302  EVA-1 repress airlock (transcript) 
 2304  RCS sep 
 2317  EVA-1 repress (docs) 
1991 Apr 8  0012   93.66 445 x 461 x 28.5 
 1259  Depressurizing airlock? 
 1417?  Prep for egress? 
 1442  Started depress 
 1443  EVA-2 EFDE 
 1444  Leak check 
 1447  Resuming depress 
 1455  At vac? 
 1456?  EVA-2 depress? 
 1456? Hatch open 
 1458  Egress 
 1512PDAP on CETA
 1520  On the CETA cart 
 1534  Deploying CETA track 
 1542  CETA track fully deplpyed 
 1545  Manual cart tests 
 1624  Working with manual cart 
 1630  Mech cart tests 
 1649  Evaluating mechanical cart 
 1706  Stow mech cart 
 1720  Begin electrical cart 
 1734  Stow elec cart? 
 1740? Working on tether shuttle 
 1740  PDAP 2 turned off 
 1759  PDAP 2 in airlock 
 1810  Completed tether shuttle work 
 1820  Stow track 
 1830ETE RMS tests 
 1850  Testing RMS/MFR/Ross 
 1920  EVA stiffness test, with RMS and CLIP 
 2000  Stow MFR 
 2015  End work with CLIP 
 2016  MFR stowed, RMS off? 
 2025Tool stowage
 2040?  Ingress 
 2041  Hatch closed 
 2044  Burn 
 2054  Repress (06:11)  93.61 442 x 459 x 28.5 
1991 Apr 9  1303   93.61 443 x 458 x 28.5 
 1519:13  OMS-3 (10s) 
 1545RV/stationkeep 15 km from GRO 
 1736RCS burn  
 1910Sep burn  
 1927   93.66 445 x 461 x 28.5 
1991 Apr 10  1100  PLBD closed 
 1400  Landing waveoff
 1417 Open PLBD
1991 Apr 11  0200 93.67 445 x 462 x 28.5 
 1110? PLBD closed 
 1245:50  OMS deorbit 3:41 134m/s  88.98 -13 x 461 x 28.5 
 1324:23  Entry interface 
 1355:29  Landed RW33 EAFB  
 1355:35  NGTD 
 1356:25  Wheels stop 
1991 Apr 16  1045SCA takeoff  EAFB 
 1540SCA landing  Kelly AFB TX 
 1815SCA takeoff   
 2030SCA landing  Columbus AFB MS 
1991 Apr 17  1415SCA takeoff   
 1850SCA landing  MacDill AFB, FL 
1991 Apr 18  1135SCA takeoff 
 1210SCA landing  KSC SLF 

1425Tow to OPF  OPF/2 