Sunday, September 3, 2000

Himawari 4

 1989-070A


GMS 4 (Himawari 4) was launched by H-I from Tanageshima. Mass was 325 kg BOL after adapter separation. 3.4 high, 2.2 dia. Launch mass around 725 kg, AKM propellant 338 kg and hydrazine capacity 41 kg.

Stage 2 was intended to be marginally suborbital with an expected splash down at 1S 143W. GMS 4 was lighter than other H-I payloads and the launch vehicle had only 6 strapon boosters instead of the usual 9.


Himawari 4 
 

DateTimeEventOrbit  

1989 Sep 5  1911:00  Launch by H-I  TNSC 
 1912  Strapons sep (T+1:25) 
  T+4:27 MECO 
  T+4:33 VECO 
 1915  Stage 1 sep (T+4:38) 
  T+4:40 SES-2 
  T+5:36 Fairing sep
 1921  Stage 2 MECO 394 km (T+10:45)  -1630? x 550? x 30.7 ? 
   -2290? x 660? x 30.7?  
 1928  Apogee 
 1937 T+26:37 Spinup 
 1937 T+26:42 St 2 sep 
 1938 Stage 3 burn 62s (T+27:05) 354 km  
 1939  TECO T+28:07 
 1940  Stage 3 sep T+29:13  
 1940 T+29:09 Stage 3 tumble 
 1942  Stage 2 reentry 
1989 Sep 5    671.80 215 x 37846 x 28.6 
1989 Sep 6  0130?  Apo 1 
 0800?  Peri 1 
1989 Sep 6  1220:10  Apo 2, T+17:09 Star 27 AKM fired 
 1235? AKM ejected 
1989 Sep 8    1456.12 35258 x 37096 x 1.7 GEO 137.2E+4.9W 
1989 Sep 19    1422.55 35256 x 35785 x 1.2 
1989 Sep 22  0256 mv in
1989 Sep 22    1436.16 35719 x 35855 x 1.7 GEO 159.7E 
1989 Nov 9    1436.10 35722 x 35851 x 1.5 GEO 159.6E 
1989 Nov 15   mv out 
1989 Dec 4   Begin data 
1989 Dec 17   mv in  
1989 Dec 27    1436.03 35779 x 35791 x 1.4 GEO 139.9E 
1990 Jan 20    1436.15 35783 x 35791 x 1.4 GEO 139.9E 
1991 Jun 30    1436.03 35782 x 35788 x 0.4 GEO 140.1E 
1993 Oct 6    1436.19 35785 x 35790 x 0.0 GEO 140.1E 
1995 Jun 9    1436.16 35783 x 35792 x 1.0 GEO 139.7E 
1995 Jun 13   mv out 
1995 Aug 7   mv in  1436.12 35781 x 35792 x 1.2 GEO 120.0E 
1995 Oct 28    1436.06 35779 x 35792 x 1.3 GEO 120.4E 
1997 Aug 3    1436.10 35781 x 35791 x 2.6 GEO 120.2E 
1999 Jun 10    1436.00 35779 x 35789 x 3.9 GEO 120.0E

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...