1999-057A
\imps{2.5}{images/99057A}
ZY-1
The 1540 kg China-Brasil Earth Resources Satellite 1, ZY-1 ("Resource") is built by CAST. Size is 1.8 x 2.0 x 2.0 m, 9.8m span box +1 panel.
The Chinese use the Xian control center, China; the Brazilian center is CRC/INPE, San Jose dos Campos.
From late October to early November the satellite's on board engine raised the orbit to sun-synchronous altitude. After that, very small orbital tweaks have maintained the altitude. In 2003 Aug the X-band transmitter failed, ending the mission. A slightly larger burn on 2003 Aug 13 marked the satellite's retirement, according to analyst Phillip Clark. The upper stage broke up into more than 125 pieces in Mar 2000.
In Mar 2007, more pieces were cataloged, but in the orbital plane of the payload, suggesting a separate event.
| ZY-1 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1999 Oct 14 | 0316 | Launch by CZ-4B | TY |
| T+2:33 Stage 1 MECO | |||
| T+2:34 Stage 1 sep | |||
| T+2:54 Fairing | |||
| T+4:37 St 2 MECO | |||
| T+4:47 St 2 VECO | |||
| T+4:48 St 2 sep | |||
| T+4:48 St 3 burn | |||
| 0327 | T+11:18 St 3 MECO | ||
| 0328 | T+12:28 ZY 1 sep | ||
| 0330? | T+12:55 SACI-1 sep | ||
| 1999 Oct 20 | 99.54 727 x 746 x 98.6 | ||
| Cal burn | 99.59 733 x 745 x 98.6 | ||
| 1999 Nov 3 | Orbit raise | 99.63 734 x 748 x 98.6 | |
| 1999 Nov 5 | Orbit raise | 99.92 747 x 763 x 98.6 | |
| 1999 Nov 6 | Orbit raise | 100.06 753 x 770 x 98.6 | |
| 1999 Nov 8 | Orbit raise | 100.27 770 x 772 x 98.6 | |
| 1999 Nov 9 | Orbit raise | 100.32 773 x 774 x 98.6 | |
| 1999 Dec 17 | Orbit trim | 100.32 773 x 775 x 98.6 | |
| 2000 Feb 28 | Orbit trim | ||
| 2000 Mar 29 | Orbit trim | ||
| 2000 Mar 11 | 1304 | Stage 4 breakup | |
| 2000 Apr 22 | Orbit trim | ||
| 2000 Jun 23 | Orbit trim | ||
| 2000 Jun | WFI failed | ||
| 2000 Aug 16 | Orbit trim | ||
| 2000 Nov 10 | Orbit trim | ||
| 2000 Dec 21 | Orbit trim | ||
| 2001 Feb 12 | Orbit trim | ||
| 2001 Apr 12 | Orbit trim | ||
| 2001 Jul 6 | Orbit trim | ||
| 2001 Oct 10 | Orbit trim | ||
| 2001 Nov 1 | Orbit trim | ||
| 2001 Dec 6 | 100.31 772 x 775 x 98.5 | ||
| 2001 Dec 6 | Orbit trim | 100.32 773 x 774 x 98.5 | |
| 2003 Aug 13 | X-band system failure | 100.32 773 x 774 x 98.4 | |
| 2006 Feb? | mv | 100.41 774 x 782 x 98.4 | |
| 2007 Mar | Objects released | ||
Payload:
- Wide Field Imager, 860 km FOV with 260m res
- Hi Res CCD Camera, 20m res
- IR Multispectral Scanner, 80m res
No comments:
Post a Comment