2013-010A
In trunk, two Heat Rejection System Grapple Fixtures to be installed on the MBS POA. Attached to P1 and S1 radiators in EVA-19.
Up cargo 677 kg including 102 kg packaging. Down cargo 1370 kg (1210 kg pay plus 160 kg packaging).
Launch mass 8830 kg; 7846 kg on Mar 2, 7656 at docking; 8182 kg after undocking.
At stage 2 separation, 3 of 4 Dragon oxidizer tanks failed to pressurize and solar array deploy was delayed in the absence of attitude control, with only Quad 1 operational. Cycling of helium isolation valves cleared the blockage in Quad 4, allowing solar array deploy. Quad 2 and 3 recovered over a 2 hour period.
| CRS2 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2013 Mar 1 | 1510:13 | Launch by Falcon 9 V1.0 | CC SLC40 |
| 1513 | T+2:55 MECO | ||
| T+3:05 St 1 sep | |||
| T+3:12 St 2 burn | |||
| 1513 | T +3:52 Nose cone sep | ||
| T+9:19 SECO | 199 x 323 x 51.66 | ||
| 1519 | T+9:46? St 2 sep | ||
| 1522 | T+12m Solar array deploy fails | ||
| 1540? | Solar array deploy | 89.76 203 x 321 x 51.7 | |
| 2100? | All thruster pods active | ||
| 2137 | Draco test burn 30s 5.05m/s | ||
| 2205 | Coelliptic Orbit raising burn 4 min 35.8 m/s | 91.09 314 x 340 x 51.7 | |
| 2013 Mar 2 | 0011 | Orbit raise HA 18.4m/s | 91.80 321 x 404 x 51.7 |
| 0056 | Orbit raise CE1 19.7m/s | 92.51 391 x 403 x 51.7 | |
| 0530? | Orbit change | 92.97 332 x 507 x 51.7 | |
| 1100? | Orbit change | 93.37 433 x 445 x 51.7 | |
| 2013 Mar 3 | 0840 | At 350m point | |
| 0905 | Range 250m | ||
| 0906 | Resume approach 250m | ||
| 0933 | Range 140m | ||
| 1000 | 30m hold point | ||
| 1006 | 30m approach resume | ||
| 1022 | At capture point | ||
| 1030 | 1m from capture | ||
| 1031 | Capture | ||
| 1340 | RTL | ||
| 1345 | First stage capture | ||
| 1356 | Final berthing at Harmony nadir CBM | ||
| 1814 | HO | ||
| 2013 Mar 4? | SSRMS ungrapple Dragon | ||
| 2013 Mar 6 | |||
| 2000? | SSRMS grapple HRSGF | ||
| 2004 | SSRMS unberth HRSGF | ||
| 2104 | SSRMS berthing HRSGF on MBS POA - range less than 1 m | ||
| 2220? | Ungrappled and moving away | ||
| 2013 Mar 22 | s | SSRMS grapple Dragon | |
| 2013 Mar 26 | 0810 | Unberth | |
| 1056:00 | Release | ||
| 1059 | Sep-1 burn | ||
| 1101 | Sep-2 burn | ||
| 1108 | Sep-3 burn | ||
| 1109 | Depart KOS | ||
| 1425s | GNC door close | ||
| 1542:33 | Deorbit near 26S 75W 9:59 | ||
| 1552:32s | Deorbit complete | ||
| 1555s | Trunk sep | ||
| 1614s | Entry | ||
| 1623s | Drogue parachute deployed | ||
| 1624s | Main parachute deployed | ||
| 1634:06 | Splashdown near 30.5N 120.1W | ||
No comments:
Post a Comment