Friday, December 9, 2016

STS-116 (Discovery)

 2006-055A


STS-116 will dock with the ISS on mission 12A.1. Launch mass is 120413 kg, landing is 102217 kg.

Sunita Williams will transfer to the Ex14 crew, joining Lopez-Alegria and Tyurin. Tomas Reiter joins the STS-116 crew.

Discovery's RMS is used to unberth the P5 spacer and hand it to the SSRMS. On EVA-1 (Quest), Curbeam and Fuglesang help install P5 to P4. Then, the port half of the P6 array, side 4B, is powered down and retracted and a TCS is filled with NH3. P3/P4 SARJ solar tracking is now activated. P1-3A DDCU-E thermal covers are removed.

P6 carries 2B and 4B power channels; P4 has 2A and 4A. S4 has 1A/3A, S6 has 1B/3B.

Now, US Segment is configured to get power from P4-2A and P6-4B via MBSU 2 and 3 and EATCS Loop B.

Then, P6 4B is deactivated and US segment is configured for power via P4-4A and MBSU 1 and 4, via EATCS Loop A. S1-4B and S0-4B DDCU-E thermal covers removed.

On EVA-2, Curbeam and Fuglesang reroute power channel 2/3 through the MBSUs. The MBSUs need the ammonia TCS to be working. During this work, channel 1/4 is carrying the load for the entire ISS.

On EVA-3, Williams and Curbeam route power channel 1/4 through their MBSUs while the station runs off channel 2/3.

At last, the P4 arrays will be activated. MT will be moved to the S1 end of the truss. to await S3/S4.

Finally, the SMDPs and adapter are transferred to PMA-3 aft GF.

After undocking, the STP-H2 payloads will be deployed.

According to Spacehab, LSM is 5399 kg full 2858 kg empty. ICC is 839 empty, with 1657 kg of payload. TA is 112 kg. STS 116 cargo transfer MD to ISS 592 kg plus 140 kg consumables, SHAB to ISS 1620 kg; ISS to MD 610 kg, ISS to SHAB 1617 kg.


STS-116 
 

DateTimeEventOrbit  

2006 Nov 1  Roll to VAB 
2006 Nov 9   Roll to LC39B 
2006 Dec 7   Scrub WX 
2006 Dec 10  0147:35  Launch  KSC LC39B 
 0149:39 SRB sep 
 0149:49  OMS ASS 
 0151:27  OMS ASS CO 
 0155:58  MECO  
 0156:19  ET sep  58 x 220 x 51.6 
 0224:42  T+38:11s OMS-2 57.3m/s 124s 
 0226:44 OMS-2 CO  220 x 250 x 51.6 
 0316:09  PLBD open  
 0436:42  OMS-3 T+2:49:07 NC1 OMS both 30.8m/s 1:07  250 x 335 x 51.6 
 0437:47  OMS 3 CO 
 1845:14  T+16:57:39 NC2 OMS-4 both 36s 17.2m/s 112642 kg  293 x 348  
 1845:50  OMS 4 CO 
 1912  Grapple OBSS 
2006 Dec 11  0120?  Reberth OBSS 
 0130?  Ungrapple OBSS 
 0444:18 NC3 RCS 111907 kg  
 1756:32  OMS 5 NC4 OMS 16s 
 1756:48  OMS 5 CO 
 1831  NCC RCS 0.2m/s 
 1912 Tally-ho ISS 15 km 
 1928:22  OMS-6L TI 2.6m/s single OMS-L, 11s, 111448  
 1928:33 OMS 6 CO 
 1948  MC1, 3s 0.8m/s 
 2010? Out of plane tweak 
 2039  MC3 
 2048  MC4 0.3m/s rdot is 1m/s 
 2116  -Rbar 120m 
 2128  +Vbar 110m 
  Approach PMA on +Vbar 
 2158  At 20m 
 2204  At 10m 
 2205  Begin final approach 
 2211:55  Soft dock with PMA 
 2225  Retracted 
 2354  HO, bell rung 
2006 Dec 12 
 0100?  Suni Williams IELK transfer 
 0118  RMS grapple P5 
  SSRMS is at end of truss (W7?) 
 0225  Unberth P5 
 0318? SSRMS grapple P5 
 0324  RMS ungrapple P5 

  EVA-1 from Quest: Curbeam, Fuglesang 
 2022  2 psi 
 2024  0.8psi  
 2026  Airlock depress (JCM) 
 2028  26mm, 0.6psi  
 2030  HO  
 2031  Battery power 
 2040? Egress 
  Translate to P5; remove launch locks 
 2208  Contact between P5 and P4 
 2217  P5 soft dock 
 2243  P5 bolted, still tightening 
 2245  SSRMS ungrapple P5; SSRMS at W7? or W8? 
 2320  P5 work complete 
 2330  Remove GF for stowage on truss 
2006 Dec 13  0015  GF stowed on MBS 
 0115  Moving to S1 
 0205  New S1 camera installed 
 0245  Fuglesang loses PGT extension socket  
  Return to airlock 
 0258  Curbeam ingress 
 0300? F ingress 
 0302  HC  
 0307  Repress 
  
 0400?  MT moves from W8 to W3 
 1828  P6 SAW-4B wing retract begins 
  P6 retract stopped at 17.5 bays 
2006 Dec 14   EVA-2 
 1923  3.5 psi 
 1932  1.0 psi 
 1935  Depress 
 1940  Hatch open 
 1941  Battery power 
 1957  Egress Curbeam 
 2000?  Egress Fuglesang 
  Rewire MBSU, DDCU 
2006 Dec 15    
 0019  Curbeam ingress 
 0029  Fuglesang ingress 
 0033  TC closed 
 0038  HC 
 0041  Repress 
2006 Dec 16  
 1919?  1.4 psi 
 1923?  Depress complete 
 1924? HO 
 1925  Battery power? 
 1934  Egress Curbeam 
 1940 egress williams 
 2112  Reconfiguration complete 
  Ready to install SMDP 
 2139  SW on arm heading to bay 
 2148  SW unberth bundle 4  
 2150? Bundle 4 on adapter 
 2200  SW unberth bundle 3  
 2208  Bundle 3 on adapter 
 2220  Bundle 2 unberthed 
 2226  Bundle 2 on adapter 
 2230  Unberth SMDP adapter 
 2255  Install adapter on PMA3 
 2325  Digital camera floats loose from S Williams 
 2350  Install AGB grapple bar on ESP 
2006 Dec 17  0021  Translating to P6 
 0050  Shaking P6 
 0144  Retract 1 bay  
 0230  Down to 11 bays; run out of time 
 0245?  Ingress 
 0252  HC  
 0256  Repress 7:31 (NASA) 
2006 Dec 18  
  EVA-4 Curbeam, Fuglesang 
 1855  Depress 
 1859  HO 
 1900  Battery power 
 1908  Egress Curbeam 
 1915 Egress Fuglesang 
  Translate to P6 
  Using tool to free up stuck SAW panels 
 2328  At 1-bay position 
 2356  Retract complete, but guide wire loose 
2006 Dec 19  0034  SABB latched 
 0050  Fixing SSRMS elbow insulation 
 0120? Ingress Fuglesang 
 0128  Ingress Curbeam 
 0135  HC 
 0138 Repress 
 1942  Hatches to ISS closed 
 2209:19  Undocking  
 2236  At 120m on Vbar, begin flyaround 
 2248  On +R bar, 200m 
 2257  On -V bar? 
 2259  Sep-1 burn 
  Sep-2 burn  
2006 Dec 20  0011:46  Sep-3 OMS 11s 
 0011:57  OMS-7 CO 
2006 Dec 21 
 0019:50  MEPSI  
 0156:44  RAFT/Marscom deploy  
  
 1822:47  ANDE canister deploy  
 1823:29  ANDE canister top from middle sep 
 1823:35  NRL FCAL separate from top can  
 1823:36  ANDE MAA fails to sep from lower can  
 1823:36  Center disk separate from lower can 
 1852:35  RCS burn (ANDE sep) 106829 kg 0.6m/s 8s 
2006 Dec 22   
 1719:14  PLBD closed 
 2127:05  OMS DO for KSC203 3:46 117.3m/s 
 2130:53  OMS DO CO  33 x  
 2159:55  EI 
 2231:59  MGTD 12:20:44:24 KSC RW15 
 2232:12 NGTD 
 2232:52  WS 
2006 Dec 23  0330Roll to OPF3 

Monday, December 5, 2016

Progress MS-04

 2016-F02


MS-04 carried 2442 kg of cargo including 710 kg prop, 420 kg water, 52 kg O2, 1260 kg dry cargo. Launch mass was 7285 kg.

The stage 3 engine failed in some way, possibly due to a turbopump fire, and the third stage disintegrated. The Progress then prematurely separated from the third stage debris, but the stage then hit the Progress twice. The debris of stage and payload fell to Earth in the Tuva republic.


MS04 
 

DateTimeEventOrbit  

2016 Dec 1  1451:52  Launch by Soyuz-U  KB LC1 
 1456:40  Blok-A sep, Blok-I burn 
 1458:14  T+6:23 Loss of contact with rocket at 181 km 
 1459:16  Progress separation 
 1459:50  Loss of contact with Progress 
  Debris impact Tuva (Choisky District) 

Monday, November 28, 2016

IGS-4

 2009-066A


Third Optical satellite launched by H-IIA F16. It was rumoured in Jan 2010 that the satellite had failed to operate but a 2014 CSICE diagram showed its primary mission concluding in that year.

Kougaku 3 gouki.


IGS O3 
 

DateTimeEventOrbit  

2009 Nov 28  0121 Launch by H2A F16  TNSC LP1 
  T+1:40 SRB-A burnout 
  T+1:47 SRB-A sep 
  T+4:20 4S? PLF sep 
 0127 T+6:35 St 1 MECO 
  T+6:43 St 1 sep 
 0127 T+6:49? Stage 2 burn  
 0136? T+15? SECO 
 0140?  Payloads separate 
   96.0 587 x 601 x 97.7 (UN) 
2014   Primary mission complete 
2015   Reserve status 

Sunday, November 13, 2016

COROT

 2006-063A


COROT (Convection, Rotation and Planetary Transits), a CNES satellite for astroseismology and extrasolar planet transit photometry search, using the Proteus bus. 600 kg mass. Launch mid 2006 by Soyuz-2-1b No. 001 from Baykonur within 14D23 upper stage engine and Fregat No. 1013 fourth stage and S (4m) fairing. ESA provides the 0.30m telescope. There are two 0.27m afocal off-axis parabolic mirrors.

Launch mass 626 kg. (605 kg PK). Size 4.10m long 1.98m dia. Box-cyl + 2 panels. Height 9m in orbit. Span unknown.

Prop system with 90m/s delta-V. The telescope is by LAM/Marseille, the detector by LEISA/Paris-Meudon. Control from Toulouse. Spacecraft by Alcatel Alenia Space/Cannes.

After a successful mission the science operations ended in 2012. The spacecraft's orbit was lowered in Jan 2014 and the vehicle was decommissioned in Jun 2014.


COROT 
 

DateTimeEventOrbit  

2006 Dec 27 1423:38 Launch by Soyuz-2-1b KB PL31/6 
 1425 T+1:55 Strapons sep 
 1428 T+4:47 Blok A sep 
 1428  T+4:48 KhO sep 
 1428  T+4:49 GO sep 
 1432:52 T+9:14 Blok I MECO  214 x 226 x 90.0 
 1432:55  T+9:17 Blok I sep 
 1433 Fregat MES-1 
 1434:30  MECO-1  218 x 950? x 90.0  
 1511  Fregat MES-2 
 1512:54  End Fregat second firing 
 1513:00  T+50:02 Separation of Corot  103.01 893 x 908 x 90.0  
 1824  Fregat depletion   
 1850?  Fregat reentry 
2009 Mar   Instrument side 1 fails 
2012 Nov 2   Science instrument side 2 failure, end of sci mission 
2013 Jan   Spacecraft still transmitting 
2013 Jun 24   COROT to be switched off, begin end ops 
  Orbit lowering planned 
2013 Sep 1    102.98 895 x 903 x 90.0 
2014 Jan 7    102.76 877 x 901 x 90.0 
2014 Jan 12   Orbit lower  101.52 754 x 907 x 90.0 
2014 Jan 14   Orbit lower  101.41 753 x 896 x 90.0 
2014 Jan 15   Orbit lower  100.83 697 x 897 x 90.0 
2014 Jan 20   Orbit lower  100.30 648 x 897 x 90.0 
2014 Jan 23   Orbit lower  99.85 605 x 896 x 90.0 
2014 Jan 29   Orbit lower  99.82 604 x 895 x 90.0 
2014 Jun 17   End of ops per ST/SG/SER.E/756  
2014 Jul 15    99.79 600 x 896 x 90.0 

Payload:

  • COROT telescope

  • Focal unit, with 4 2048 x 4096 CCDs in the 3700-9500A range, and dioptric f=1200mm objectiv

Monday, November 7, 2016

Xinnuo 3

 2007-021A


CAST DFH-3 satellite, Sinosat-3 (Xinnuo 3) Acquired by China Telecom in 2010 and renamed Zhongxing 5C, moved to 163E. In 2011, acquired by Eutelsat and moved to 1.6E to the ITU-registered F-Sat-Ku-E-1.6E location [947], but shortly afterwards moved to 3.0E and renamed Eutelsat 3A. It later moved to 8W before retirement.


Sinosat 3 
 

DateTimeEventOrbit  

2007 May 31  1608  Launch by CZ-3A  XSC 
  T+2:25 Stage 1 MECO 
  T+2:27 Stage 2 MES, Stage 1 sep 
  T+3:52 Fairing sep
  T+4:15 St 2 MECO 
  T+4:20 St 2 VECO 
  T+4:21 St 2 sep, St 3 MES 
 1618 T+10:19? St 3 MECO-1  200 x 200 x 28.5?  
 1628?  MES-2 
 1630? MECO-2 
 1632  St 3 sep 
2007 May 31    753.42 194 x 41904 x 25.1 
2007 Jun 16    1436.10 35779 x 35793 x 0.3 GEO 125.1E 
2010 Apr 6    1436.10 35776 x 35796 x 0.0 GEO 125.0E 
2010 Oct 20   GEO 125E 
2010 Oct 20?  Moved to 163E 
2010 Nov 1    1436.29 35780 x 35799 x 0.1 GEO 163.0E 
2010 Dec 14    1436.11 35779 x 35794 x 0.0 GEO 163.0E 
2010 Dec 28   Move out 
   1441.51 35869 x 35915 x 0.2 dr 1.4W/d 
2011 Apr 20   Move in at 1.5E 
2011 Apr 30    1436.16 35779 x 35796 x 0.1 GEO 1.6E 
2011 Jul 9   Move from 1.5E to 3.0E 
2011 Jul 13    1435.78 35771 x 35799 x 0.1 GEO 3.0E 
2014 Jun 30    1436.12 35786 x 35787 x 0.1 GEO 3.3E 
2014 Jul 4   Move out from 3E 
2014 Jul 27   Move in at 8W 
2014 Jul 28    1436.91 35786 x 35818 x 0.2 GEO 7.9W 
2014 Nov 2    1436.09 35764 x 35808 x 0.4 GEO 7.9W 

Monday, October 24, 2016

ST-1

 1998-049A


The Singapore-Taiwan-1 (ST-1) satellite (Singasat) is a Eurostar 2000+ built by Matra Marconi Space/France. It was launched by Ariane 44P. The project is a joint venture between Singapore Telecom (SingTel) and Chunghwa Telecom of Taiwan. Mass is 3255 kg full, 1753 kg BOL, 1502 kg dry. Size is 2.5 x 1.7 m x 2.9m The satellite was stationed at 88E, raising concerns about conflicts with the nearby Chinastar.

In 2001, SingTel also absorbed the Optus satellite system. The satellite was relocated in 2013 to 125E and then moved again.


ST-1 
 

DateTimeEventOrbit  

1998 Aug 25  2307  Launch by Ariane 44P (V-109) 
  T+1:11 SRM sep 
  T+3:32 St 1 sep 
  T+3:35 St 2 burn 
  T+4:28 Fairing sep 
  T+5:44 St 2 sep 
 2312 T+5:49 St 3 burn 
 2326 T+19:01 St 3 cutoff 
 2327 T+20:33 St 3 sep 
1998 Aug 26    632.42 295 x 35759 x 3.9 
1998 Aug 27  1230? LAM-1 
1998 Aug 27    776.80 7491 x 35736 x 1.8 
1998 Aug 28  1420? LAM-2 
1998 Aug 29    1166.88 24937 x 35967 x 0.3 
1998 Aug 30  0500? LAM-3 
1998 Aug 31    1430.92 35420 x 35950 x 0.2 GEO 84.0E+1.3E 
1998 Sep 21    1436.09 35755 x 35817 x 0.0 GEO 88.0E 
1998 Dec 2    1436.12 35779 x 35794 x 0.0 GEO 88.0E 
1999 Oct 16    1436.12 35777 x 35795 x 0.0 GEO 88.0E 
2006 Aug 3    1436.10 35771 x 35802 x 0.0 GEO 88.0E 
2013 Jan 16   Move out 88E 1436.11 35771 x 35802 x 1.2 GEO 88.1E 
2013 Apr 9   Move in 125E 1436.03 35769 x 35801 x 1.4 GEO 124.9E 
2013 Jul 20  1436.14 35770 x 35804 x 1.6 GEO 124.8E 

Tuesday, October 18, 2016

Cluster 2

2000-045B


Cluster FM8, C4 is launched with FM5 on the second dual Soyuz-Fregat launch. Mass 1186 kg launch, 550 dry.


Cluster FM8 
 

DateTimeEventOrbit  

2000 Aug 9  1113:35  Launch by Soyuz-Fregat 
 1116:34  Strapons sep 
 1117  Fairing 
 1119 Blok-A sep 
 1119 Blok-I burn  
  Fairing sep 
  Blok-I underburn 
  Blok-I MECO  SO x 64.8 
 1122 T+8:48 Blok-I sep, 217 km 
 1122 T+8:50? Fregat burn 1 3:45 
 1126? Fregat MECO-1  200 x 200 x 64.8 
  Fregat MES-2 
  Fregat MECO-2 
 1243? Fregat sep, alt 1000 km 
  FM8 sep from FM5 
2000 Aug 10  0853  LAM-1  239 x 23199 x 64.9 
2000 Aug 11  0458  LAM-2  240 x 33997 x 64.9 
2000 Aug 12  0019  LAM-3 
2000 Aug 12  1636? LAM-4 
2000 Aug 13  1658  Inc mvr 
2000 Aug 15  s  Rendezvous 
2000 Oct 25   Begin boom deploy 
2000 Nov  s  Complete boom deploy 
2001 May 10   Manuevers begin 
2003 Jun 4    18699 x 119082 x 89.5  
2006   Move to along-track sep from C3 
2010 Jul 21  1911  TCM 
2010 Jul 30  2016  TCM 
2010 Aug 8    1856 x 130941 x 129.6 
2011 Nov 15    1089 x 131679 x 140.9 
2012 Jan 31    1644 x 131141 x 141.6 
2012 Oct 3    4325 x 128464 x 140.16 
2012 Oct   Orbit adjust 
2012 Oct 12    8124 x 128639 x 130.64 
2013 Jul 15   New close formation 
2013 Jul 27    8897 x 123909 x 136.75 
2013 Aug 30  0037  Closest pass of 9.1 km to C1 
2014 Jun 17    14857 x 118216 x 133.6 


2000-045A


The Cluster Flight Model 5 satellite was refurbished after the Ariane 5 failure to become Project Phoenix. It was renamed Rumba. It was launched with Cluster FM8 on a Soyuz in Jul 2000. into a 250 x 250 km x 51.8 deg orbit. A Fregat kick stage raises the orbit to 250 x 18000 km x ?. Then the satellites separate from the kick stage and use their S400 engines to get to the 4 x 19.6 Re orbit. 25500 x 125000 km polar.

Mass of Cluster/Fregat at Blok I sep is 7847 kg. After MECO-1 mass is 6810 kg.

The Blok I suffered an 3.5s underburn,possibly due to the stage having too little fuel loaded. The Fregat made up the difference. A report said that the second Fregat burn went till depletion, but other indications are that the Fregat did make a third deorbit burn since Space Command tracked it with a negative perigee after apogee.

Cluster FM5 was known after launch as Rumba and as C1.


Cluster FM5 
 

DateTimeEventOrbit  

2000 Aug 9  1113:35  Launch by Soyuz-Fregat 
 1116:34  Strapons sep 
 1116:41  Fairing 
 1119 Blok-A sep 
 1119 Blok-I burn  
  Fairing sep 
  Blok-I MECO 3.5s early -1301 x 206 x 64.8  
 1122:21 T+8:48 Blok-I sep  
 1122:29 T+8:54 Fregat burn 1 (MDU burn for 3:28) 
 1123:21  MDU on (3:28) 
 1126:50 Fregat MECO-1  186 x 202 x 64.8 
 1134? Blok I reentry 
 1228:04 T+1:14:29 Fregat burn 2 
 1229:00 Fregat MDU MES-2 
 1237:20 T+1:24:10 Fregat MECO-2  251 x 17075 x 64.9 
 1242:59 sT+1:29:51 Fregat sep, alt 1000 km 
 1243:09 sT+1:30:01 FM5/FM8 sep 
 1510  Fregat apogee 
 1510:15  T+3:56:41 Fregat deorbit 
 1513:32  T+3:59:21 Fregat MECO-3  -157 x 17075 x 64.9 
 1741:44  Fregat reentry 21:28S 70:06W 
  (Chile coast) 
2000 Aug 10  1359  LAM-1  239 x 23199 x 64.9 
2000 Aug 11  0340  LAM-2  240 x 33997 x 64.9 
2000 Aug 11  2335 LAM-3  
2000 Aug 12  1630?  LAM-4 
2000 Aug 13  1655  Inc mvr  17200 x 120600 x 90 
2000 Aug 15  s  Rendezvous 
2000 Sep 7   Boom deploy begin to 15m 
2001 May 10   Manuevers begin 
2010 Jul 21  1923  TCM 
2010 Jul 30  2037  TCM 
2010 Sep 2  1901  TCM 
2010 Sep 7  0736  TCM 
2013 Jul 15   New close formation 
2013 Jul 31    12280 x 120510 x 139.4 
2013 Aug 30  0037  Closest pass of 9.1 km to C4 
2013 Sep 19  1112  Closest pass of 5 km to C3 
2015 Mar 11    22016 x 110774 x 135.6 

Tuesday, October 4, 2016

DirecTV 1R

 1999-056A


DIRECTV Inc. satellite (DirecTV-1R). HS-601HP to supplement DBS series at 101W. Total power 7.5kW. Mass 3447 kg. Launch by Zenit-3SL from 154W 0N.

In Oct 2012 DTV-1R was transferred to 56.16E for RSCC (Kos. Svyaz) services in inclined orbit, backing up the Bonum 1 satellite.


DirecTV 1-R 
 

DateTimeEventOrbit  

1999 Oct 10  0328:00 Launch by Zenit-3SL  Odyssey 
  T+2:26 Stage 1 sep, 76 km 
  T+3:16 PLF sep, 116 km  
 0337 T+9:05 Stage 2 sep, 200 km  -2220? x 200 x 1 
 0337 T+9:15 DM-SL burn 1, 200 km  
 0344 T+16:41 DM-SL MECO, 193 km  184.0 180 x 8495 x 0.6  
 0417:55 T+49:55 DM-SL burn 2, 4323 km 
 0421:04 T+53:04 DM-SL MECO-2, 4800 km 
 0429:14 T+1:01:14 DM-SL sep 
1999 Oct 11    682.13 2827 x 35753 x 0.6 
1999 Oct 12  1830? LAM-1 
1999 Oct 12    842.48 10582 x 35758 x 0.8 
1999 Oct 13  2230? LAM-2 
1999 Oct 13    1296.90 30242 x 35789 x 0.2 
1999 Oct 15  1830? LAM-3 
1999 Oct 15    1406.04 34609 x 35782 x 0.1 
1999 Oct 16  1930?  LAM-4 
1999 Oct 17    1435.59 35763 x 35789 x 0.1 82.0W+0.1E 
1999 Oct 26    1436.11 35781 x 35792 x 0.1 GEO 81.6W 
1999 Nov   Control to DirecTV 
1999 Nov 9    1436.11 35780 x 35792 x 0.0 GEO 81.6W 
1999 Nov   Relocate to 101W 
1999 Nov 28    1436.10 35785 x 35788 x 0.0 GEO 101.2W 
2002 Jul 3    1436.08 35774 x 35797 x 0.0 GEO 101.2W 
2002 Sep   Move to 100.8W 
2002 Oct 24    1436.10 35777 x 35795 x 0.0 GEO 100.8W 
2006 Aug 3    1436.09 35778 x 35794 x 0.0 GEO 100.8W 
2007 Mar 10   Move out of 100W 
2007 Apr 10   Move in at 72.5W 
2012 Jan 9    1436.11 35776 x 35797 x 0.1 GEO 72.5W 
2012 Jan   Move from 72.5W to 109.8W 
2012 Jan 12   Mv out  1438.11 35813 x 35838 x 0.1 GEO 74.0W+0.5W/d 
2012 Mar 24   Mv in  1436.14 35777 x 35797 x 0.3 GEO 109.8W 
2012 Sep 1    1436.09 35770 x 35802 x 0.6 GEO 109.8W 
2012 Sep 13   Move out, drift E 
2012 Sep 20    1429.21 35631 x 35671 x 0.6 GE 94W+1.7E/d 
2012 Oct   Lease to RSCC for Bonum services 
2014 Apr 9    1436.08 35777 x 35795 x 1.5 GEO 55.9E 
2014 Apr 30    1436.07 35775 x 35796 x 1.5 GEO 55.9E

Tuesday, September 20, 2016

Ofeq 11

 2016-056A


\uni{ אופק }{ }
11

Possibly OPSAT-2000 (like previous Ofeq sats) or a new OPSAT-3000 satellites.

Times based on earlier missions. Launch was reported to be around 1430 UTC; Russian sources (in particular the Novosti Kosmonavtiki forum) reported 1438 UTC.


O11 
 

DateTimeEventOrbit  

2016 Sep 12  1438?  Launch by Shavit  Palmachim 
  Stage 1 MECO at T+0:52 
 1439? Stage 1 sep 
  Stage 2 MECO at T+1:44, 
 1440? Stage 2 sep, 110 km  
 1445? Fairing (2 pieces) sep, 250 km 
 1445? Main equipment compartment sep 
 1446? Stage 3 92s burn over W Med.   
 1447? Stage 3 sep  250 ? x 600? x 141? 

The Swans of Fifth Avenue

https://welib.org/md5/f43c09724831a5e59fc76426f17d5d15

Wednesday, September 14, 2016

Eutelsat W1

 2000-052A


Launch mass is 3250 kg. Dry mass is 1430 kg. Size is 2.5 x 3.4 x 5.0m, 8.0m high deployed, Span 31.7m. Stage 3 plus VEB has a mass of 2190 kg. Launch due 2000 Sep to 10E to replace 2F4.

Eutelsat W1 will occupy the 10E orbital slot. The first Eutelsat W1 satellite, an Alcatel Spacebus 3000, was damaged in a fire in the Cannes factory in 1998. Construction of a second Eutelsat "W1R", another Spacebus 3000, was begun as well as a ground spare, called Ressat, built by Matra Marconi Space/Toulouse (now part of the Astrium company) and using a Eurostar 2000+ bus. This second Eutelsat W1 was reassigned to become Eurobird, and will be launched to 28E, with Ressat becoming the third and final Eutelsat W1. This satellite, the Eurostar 2000+, was the one launched on Sep 6. Its mass is 1430 kg, with a further 1820 kg of propellant at launch for its Primex R-4D liquid apogee engine. The box-shaped 2.5 x 5.0 m satellite has two rectangular solar panel arrays spanning 31.7m and two dishes, a European beam and a steerable beam. The payload includes 28 Ku-band transponders.

The satellite was named Eurobird 4A at some point, probably in June 2009.


Eutelsat W1 
 

DateTimeEventOrbit  

2000 Sep 6 2233 Launch by Ariane 44P V132  CSG ELA2 
  T+1:12 PAL sep 
  T+3:33 St 1 sep 
  T+3:34 St 2 TIG 
  T+4:26 Fairing 01 sep 
  T+5:44 St 2 sep 
  T+5:47 St 3 TIG 
  T+10:30 v=5.8  -3200 x 300 
  T+12:00 v=6.3  -2300 x 300 
  T+13:10 v=6.8  -1300 x 300 
  T+14:30 v=7.33  289 x 350 
  T+15:35 v=7.81  285 x 2400  
  T+16:30 v=8.2  287 x 5000 
  T+18:00 v=9.1  306 x 15000 
 2251 T+18:49 St 3 MECO 
  T+19:30 v=9.6  300 x 31530 
 2253 T+20:09 W1 sep 
  T+20:14 St 3 sep burn 
  T+21:38 V132 mission complete 
2000 Sep 8    632.94 313 x 35769 x 7.0 
2000 Sep 8   LAM-1  800.26 8604 x 35744 x 2.9 
2000 Sep 9   LAM-2  1321.61 31271 x 35758 x 0.2 
2000 Sep 11?  LAM-3   
2000 Sep 19    1436.19 35774 x 35802 x 0.1 GEO 1.6E 
2000 Oct 14    1430.39 35619 x 35730 x0.0 GEO 13.0E+1.4E 
2000 Oct 21   Move in at 10.0E 
2000 Nov 19    1436.10 35669 x 35903 x 0.1 GEO 10.0E 
2005 Aug 10   Attitude control problem 
2005 Aug 11   problem fixed 
2006 Aug 1    1436.07 35767 x 35805 x 0.1 GEO 10.0E 
2009 May 28    1436.14 35770 x 35804 x 0.0 GEO 10.1E 
2009 Jun 1   Move out 
2009 Jun 5   Move in at 4E 
2009 Jun 11    1436.08 35774 x 35798 x 0.1 GEO 4.0E 
2012 Feb 9    1436.08 35758 x 35814 x 0.4 GEO 4.0E 

November 20,2006

  https://en.wikipedia.org/wiki/Association_football