STS-4 (Columbia)

 1982-065A


STS-4 was the fourth and last Orbital Test Flight mission. Launch of STS-4 was at 1500:00 on 1982 Jun 27. After four OMS burns, Columbia entered a 295 x 303 km x 28.5 deg orbit. The crew ran into a major payload problem when the aperture door on the CIRRIS telescope failed to deploy. On Jun 29, it was time for more tests of the RMS. The RMS grappled the Induced Environment Contamination Monitor and moved it around the bay to make contamination measurements. The next two days saw more tests of the payload bay doors and of the RCS and OMS engines. At 1100 on Jul 2, Mattingly tested out the new EVA spacesuit. Later that day, more RCS burns were used to test the dynamics of the RMS arm. Columbia landed at Edwards AFB on Jul 4.


STS-4 
 

DateTimeEventOrbit  

1982 May 18   Rollover  VAB/3 
1982 May 25   ET mate 
1982 May 26   Rollout  LC39A 
1982 Jun 27  1500:00  Launch, LC39A 
 1502:10  SRB sep (47.6 km) 
 1508:33  MECO 
 1508:50  ET sep (108.1 km)  86.04 -17 x 172 x 28.5 
   86.03 -13 x 168 x 28.5 
 1510:33  OMS-1 (88s) 46.6m/s 87.58 63 x 241 x 28.5 
 1512:01  OMS-1 CO 
 1526ET apogee 
 1537:41  OMS-2 (104s) 53.1m/s   
 1539:26  OMS-2 CO  
 1547  ET breakup 
 1701  PLBD open  89.38 237 x 249 x 28.5 
 1929:13  OMS 3 (32s) 16m/s  89.98 249 x 296 x 28.5 
 2014:11  OMS 4 (32s) 16m/s 90.54 296 x 304 x 28.52 
1982 Jun 29   RMS grapple IECM 
 1217  RMS unberth IECM 
 1532  RMS reberth IECM 
 1600  RMS unberth IECM  90.52 296 x 303 x 28.5 
 1812  RMS reberth IECM 
 1950RCS burn
1982 Jun 30  0553   90.56 297 x 306 x 28.5 
1982 Jun 30  1748  PLBD closed  
 1956  PLBD open 
1982 Jul 1  1026  PLBD closed 
 1113  PLBD open 
 1330  RCS  90.55 296 x 306 x 28.5 
 1345  RCS  
 1833  OMS 5 (LH, 17s) 4.5m/s 90.70 304 x 312 x 28.5 
1982 Jul 2  0855  RCS   
 1055  RCS  90.73 301 x 319 x 28.5 
 1659  RCS (RMS test)   
 1741  RCS (RMS test)   
  RCS  89.77 302 x 322 x 28.5 
1982 Jul 4  0152   90.77 300 x 324 x 28.5 
1982 Jul 4  1147  Begin to close PLBD  90.77 305 x 318 x 28.5 
 1211  PLBD closed   
 1510:00  OMS DO (171s) 94.2m/s 
 1512:53  OMS DO CO 
 1540:23  Entry 
 1609:40  Landing  RW22 EAFB 
 1609:53  NGTD 
 1610:54  Wheels stop 
1982 Jul 14  1446  SCA  Dyess AFB, TX 
1982 Jul 15  1430  SCA arr. KSC  KSC SLF 
1982 Jul 16  0100OPF/1 

Payload:

  • R-11 (DoD 82-1)

  • DFI Development Flight Instrumentation

  • IECM Induced Environment Contamination Monitor

  • ACIP

  • G-001 GAS (Utah State University/R. Gilbert Moore) Fruit flies, brine shrimp, duckweed, algae, Composite curing,soldering, alloy formation, Surface tension, thermal conductivity, System thermal survey. (Power and electrical problems)

  • Middeck

  • MLR Monodisperse Latex Reactor

  • CFES1 Continuous Flow Electrophoresis System 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...