Monday, February 11, 2013

STS-122 (Atlantis)

 2008-005A


Launch mass 121264 kg. Landing mass 93536 kg.

725 kg of middeck ISS cargo up; a similar amount down.

Dan Tani will be returned from station, replaced by Leo Eyharts. Columbus will be docked to Harmony starboard CBM. The PDGF will be moved from the sidewall carrier to Columbus. Atlantis will resupply the ISS with water. The P1 NTA is replaced; the SOLAR and EUTEF experiments are moved from ICC to the EPF.


STS-122 
 

DateTimeEventOrbit  

2007 Nov 3   Tow to VAB 
2007 Nov   Rollout to LC39A 
2007 Dec 6   Scrub ECO, T-6h 
2007 Dec 9   Scrub ECO, T-8h 
2008 Feb 7  1945:30  Launch  KSC LC39A 
 1947:34  SRB sep 
 1947:44  OMS assist 
 1949:37  OMS Ass CO 
 1953:53  MECO command 
 1954:00  Zero thrust 
 1954:15  ET sep  58 x 230 x 51.6  
 2023:10 T+37:40s OMS-2 1:44   
 2024:54 OMS-2 CO  220 x 230 x 51.6 
 2100?  ET reentry 
 2135:59  PLBD open 
 2137  PLBD open complete  215 x 233 x 51.6 
 2322:47  OMS-3 NC1 burn  
 2323:02  OMS-3 CO 
2008 Feb 8  1242:44  OMS-4 R NC2 
 1242:54  OMS-4 CO 
 1255  NPC 
 2225  NC3  229 x 254 x 51.6 
2008 Feb 9  1216:15  OMS-5 
 1217:14  OMS-5 CO 
 1306:11  OMS-6 NC4  331 x 339 x 51.6 
 1307:00  OMS-6 CO 
 1437:28  OMS-7 L TI 112164 kg  
 1437:39  OMS-7 CO 
 1500  MC1  
 1526  MC2 
 1546  MC3 
 1549  1.6 km range 
 1610  180m on -Rbar 
 1627  Begin RPM 
 1632  RPM complete 
 1648  90m on +Vbar, skeep 
 1650  Approach 
 1657  49m  
 1705  21m 
 1717:15  Docking  
 1840  HO to ISS 
 2018  SSRMS grapple OBSS 
 2033  OBSS unberth 
 2053  SRMS grapple OBSS 
 2056  SSRMS ungrapple OBSS 
 2220  Eyharts IELK swap 
2008 Feb 10  1207  91.24 331 x 339 x 51.6 
2008 Feb 11   EVA-1 Love, Walheim 
 1346  Begin depress 
 1400  4.0psi 
 1408  0.9psi? 
 1412  0.6psi, Depress  
 1413  HO 
 1415  Battery power 
 1426  Walheim egress 
 1438  Love egress 
 1602  PDGF removed from PLB 
 1659  PDGF installed on COF 
  COF arm heater cables attached 
  COF CBM covers removed 
 1933  SSRMS grapple COF 
 1956  SSRMS unberth COF 
 2125  Walheim preps for removing NTA on P1 
 2125  COF approaching mate 
 2129  COF RTL on Node 2 
 2133  First stage capture 
 2144  Stage 2 capture, COF docked 
 2152? Walheim ingress 
 2201?  Love ingress 
 2208  HC 
 2212  Repress 
2008 Feb 12  1255s  SSRMS ungrapple COF 
 1420?  Crew ingress Columbus 
2008 Feb 13   EVA-2 Walheim, Schlegel 
 1421  0.7 psi depress 
 1422  0.6 psi 
 1425  HO  
 1427  Battery power 
 1440?  Walheim egress 
 1448  Schlegel egress  
 1628  New NTA removed from ICC 
 1700  New NTA temp stowed on CETA; remove old NTA 
 1730  Old NTA removed by Walheim, temp stow on CETA 
 1742  New NTA installed in P1 
 1825  Old NTA in hand on end of SSRMS, at CETA 
 1900  Old NTA in ICC 
  Columbus trunnion covers 
 2050  Walheim ingress 
 2057  Schlegel ingress 
 2105  HC  91.24 331 x 339 x 51.6 
 2112  Repress 
2008 Feb 15   EVA-3 Walheim, Love  91.24 331 x 339 x 51.6  
 1306?  Depress 
 1307  HO 
 1309  Battery power 
 1316  Walheim egress 
 1328  Love egress 
 1400  Install handrails on Columbus 
 1455  Love on SSRMS removes Solar from ICC 
 1530  SOLAR installed on EPF 
 1640  Unbolting failed CMG from ESP-2 
 1725  Berthing CMG on ICC-L 
 1810? Unberthing EUTEF from ICC-L 
 1850? EUTEF on COF EPF 
 1935  Inspecting airlock handrail divot 
 2015? Ingress Walheim 
 2020 Ingress Love 
 2021  TC closed 
 2025 HC start 
 2029  HC and locked 
 2033  Repress 
2008 Feb 16  1218  Reboost ISS 
 1300? Reboost complete  91.30 332 x 343 x 51.6 
2008 Feb 17  1759  HC to ISS 
2008 Feb 18    
 0924:40  Undocking 
 0956  120m on +Vbar; begin flyaround 
 1008  Atlantis on +Rbar above ISS, 180m 
 1019  On -vbar 
 1031  Below ISS, -Rbar  
 1042  On +Vbar, flyaround complete 
 1042  Sep-1 
 1112  Sep-2  91.26 329 x 343 x 51.6 
2008 Feb 20  1026:31 PLBD closed  91.25 329 x 342 x 51.6 
 1259:52  OMS DO 2:44 88.4m/s? 
 1302:35  OMS DO CO 
 1335:30 Entry interface  
 1407:09 MGTD KSC RW15 
 1407:20 NGTD 
 1408:08 WS 

1925Tow to OPF/1 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...